Laserfiche WebLink
• <br /> • <br /> STORMWATER SITE PLAN OCTOBER 23,2019 <br /> EMORYS ON SILVER LAKE PAGE 5 <br /> clean, well organized, and free of debris. If required, BMPs to be implemented to control <br /> specific sources of pollutants are discussed below. <br /> Vehicles,construction equipment,and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas will be <br /> inspected regularly to detect any leaks or spills, and to identify maintenance needs to <br /> prevent leaks or spills. <br /> • On-site fueling tanks and petroleum product storage containers shall include <br /> secondary containment. <br /> • Spill prevention measures, such as drip pans, will be used when conducting <br /> maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site, temporary plastic will be placed <br /> beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge or <br /> spill incident. <br /> Chemical storage: <br /> • Any chemicals stored in the construction areas will conform to the appropriate <br /> source control BMPs listed in Volume IV of the Ecology Stormwater Manual. In Western <br /> WA, all chemicals shall have cover, containment, and protection provided on site, per <br /> BMP C153 for material delivery, storage and containment in the Surface Water <br /> Management Manual for Western Washington, 2012/14. <br /> • Application of agricultural chemicals, including fertilizers and pesticides, shall be <br /> conducted in a manner and at application rates that will not result in loss of chemical to <br /> stormwater runoff. Manufacturers' recommendations for application procedures and <br /> rates shall be followed. <br /> Demolition: <br /> • Dust released from demolished sidewalks shall be controlled using dust control <br /> measures (BMP C140). <br /> • Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or <br /> debris will be protected using storm drain inlet protection (BMP C220 as indicated on <br /> the plan). <br /> • Process water and slurry resulting from sawcutting and surfacing operations will <br /> be prevented from entering the waters of the state by implementing sawcutting and <br /> surfacing pollution prevention measures (BMP C152). <br /> 1. Slurry and cutting shall be vacuumed during cutting and surfacing <br /> operations. <br /> 2. Slurry and cuttings shall not drain to any natural or constructed drainage <br /> conveyance. <br /> 3. Collected slurry and cuttings shall be disposed of in a manner that does <br /> not violate groundwater or surface water quality standards. <br /> P:\Work\Projects\2018\18-141 Emory's\CE\DOCS\Final SSP 18-141.doc <br />