Ms. Courtney Crosby • <br /> Plan Check Number: B2004-017, Second Structural Review <br /> August 5, 2020 <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the building codes. Upon submittal of the revised documents, your application <br /> will be given priority and the review will recommence. <br /> Structural <br /> General: <br /> 2. This comment has not been completely addressed. The submitted documents include drawings <br /> that appear to be prepared by both the applicant and an engineer. Separated the documents. <br /> The large documents are the Construction Documents, there is a folder with the Structural <br /> Documents and another folder for this cover letter. The documentation provided by the <br /> engineer should be clearly separated into construction drawings and structural calculations. <br /> The documents intended to specify the required construction for the proposed project should be <br /> assembled together into a coordinated set of construction drawings, including cross-references <br /> when appropriate. Each document was provided <br /> Original Comment: The submittal includes a single document comprising both the structural <br /> calculations and construction drawings. A separate document containing the construction <br /> drawings should be submitted for review. See IBC Section 107.1 and 107.2.1. <br /> 3. This comment has not been completely addressed. It appears that the submittal documents <br /> include a brief document of standard notes created by the engineer. The notes do not include <br /> all of the requested information. The majority of the information in the notes does not appear <br /> applicable to this project. Note that the completeness of the notes cannot be determined at <br /> this time due to deficiencies in the submitted drawing (see other review comment below). <br /> Original Comment: The construction drawings should specify design loads and other information <br /> pertinent to the structural design per IBC Section 1603.1. Geotechnical information, including <br /> but not limited to the design soil bearing pressure, should be specified per IBC Section <br /> 1603.1.6. Design criteria pertinent to the design of the structure (e.g., live and dead loads, <br /> seismic and wind loads, etc.) should be specified. All of this was specified in the structural <br /> notes. I_have called out each page in the structural section for you. <br /> 4. This comment has not been completely addressed. See Comment 3 above for additional <br /> information. This comment was addressed in the drawings. Every nail, fastener and building <br /> material was provided on the construction drawings with comments on the sides outlining each <br /> piece. You will see this addressed individually as this is stated a few times in other areas <br /> below. <br /> 1(r-� 3200 Cedar Street everetteps@everettwa.gov <br /> �: <br /> Everett, WA 98201 -� 42S.2S7.8810 425.257.8857 fax • everettwa.gov/permits <br /> Page 2 of-7 <br />