Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 1. Furnishing and placing of Detectable Marking Tape (tracer wire) above the pipes. <br /> 2. Furnishing and placing Buoyancy Warning Tape above the pipes, as indicated on the Plans. <br /> ' 3. Installation of pipe anchors and pipe cutoff walls, where indicated on the Plans. <br /> 4. Temporary and permanent thrust blocking and dead man blocks, and temporary and <br /> permanent restraint systems. <br /> ' 5. Ethafoam pads or sand backfill between these installations and any existing watermains or <br /> other pipes encountered. <br /> 6. Maintenance of existing CSO pressure mains. <br /> ' 7. Maintenance, restoration and/or relocation, if required, of existing culverts, storm drainage <br /> pipe, other utilities and structures affected by construction that are to remain. <br /> 8. Abandonment of existing CSO pressure mains,where indicated on the Plans, including cutting, <br /> draining and properly disposing, and plugging pipe at each end with a minimum of 2-feet of <br /> Commercial concrete or CDF. Include the concrete or CDF work with this work with no direct <br /> compensation being made. <br /> 9. CCTV inspections and flushing and cleaning of the lines. <br /> ' 10. Trench excavation bedding and backfill will be paid for under other bid items and are not <br /> included in this Work. <br /> Partial Payments will be made for the per linear foot pipe contract price as follows: <br /> 1. A total of 15% of the total bid cost will be made based upon required material submittal and <br /> acceptance and procurement of the pipe. Payment will be prorated on a per LF basis of pipe <br /> procured to the total pipe quantity. <br /> 2. A total of 25% of the total bid cost will be made for delivery to the project or approved staging <br /> and storage area, inspection and acceptance of the pipes, and inspection and approval of the <br /> material storage method and location, by the Engineer. <br /> 3. The remainder of the payment will be made per linear foot of installed pipe for completion of <br /> installation, testing and acceptance, CCTV inspections, and flushing and cleaning of the lines <br /> of the installed pipes as described above. <br /> Bid Item 23 - FRPP Sanitary Sewer Pipe, 42 In. Diam. <br /> Measurement and Payment: Linear Foot (LF) <br /> Unit cost per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the vertical <br /> intersection of the centerline of the pipe measured with the centerline of the intersection pipe, or <br /> with the beginning or ending of any new linear length of valves or couplings contained within the <br /> measured length. At changes in pipe size connected by a reducer, the point of measurement shall <br /> be taken as the midpoint of the reducer. <br /> The unit contract price shall constitute full compensation for all labor, materials, tools and <br /> equipment necessary to furnish, install, pressure test and CCTV inspect the pipe, restrained joints <br /> (where shown on the Plans or as required by the Standard Specifications and Special Provisions), <br /> including all fittings, including tees, crosses, reducers, couplings, and sleeves required for <br /> complete installation along the run of each pipe size, as shown on the Plans and specified herein, <br /> ' and additionally, shall include, but not be limited to, the following: <br /> 1. Furnishing and placing of Detectable Marking Tape (tracer wire) above the pipes. <br /> 2. Furnishing and placing Buoyancy Warning Tape above the pipes, as indicated on the Plans. <br /> ' 3. Installation of pipe anchors and pipe cutoff walls, where indicated on the Plans. <br /> 4. All costs associated with furnishing and installing the Tee with 24" Blind flange, as detailed on <br /> the Plans. <br /> POE Combined Sewer Main Imp. Division B—Bid Item Descriptions October 2021 <br /> ' Work Order#UP3768 SP-10 <br />