My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contract Execution Date: The date the Mayor of the City of Everett signs the Contract or the <br /> date that the Contractor signs the Contract, whichever date is later. This officially binds the <br /> Contractor to the Contract. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the City to the Contractor <br /> for the Work described in the Contract Documents, as modified by Change Orders. <br /> Contract Time: The period of time established by the terms and conditions of the Contract within <br /> which the Work must be physically completed. <br /> COVID-19: Disease related to the novel coronavirus (SARS-CoV-2), which is the subject of <br /> Governor' Inslee's proclamation dated February 29, 2020, and subsequent proclamations. <br /> COVID-19 Requirements: All governmental laws, regulations, requirements, and orders relating <br /> to COVID-19, including without limitation OSHA, L&I or other safety rules relating to COVID-19 <br /> and COVID-19 gubernatorial proclamations and orders. <br /> Delay: Any increase in the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. <br /> Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving <br /> parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract <br /> Time. <br /> Extra Work: Providing materials and Equipment and the performance of Work not directly called <br /> for in, or implied by, the Contract Documents, such that Contractor would be entitled to an <br /> adjustment of Contract Sum and possibly an extension of Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's <br /> Work has been completed, except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the early finish <br /> date and the late finish date of an activity in the Project schedule. <br /> Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br /> Furnish: To deliver items, Equipment, or material to the job site or other specified location. <br /> Install: Placing, erecting, or constructing complete in place items, Equipment, or material. <br /> May: Conduct that is permitted, but not required. <br /> Notice: A signed, written communication by the Contractor to the City as described in 1-04.5 <br /> NOTICE BY CONTRACTOR of these Special Provisions. <br /> Notice of Award: The written notice from the City of Everett to the successful Bidder signifying <br /> the City's acceptance of the Bid. No Contract is formed until the Contract Execution Date. <br /> Notice to Proceed: The written Notice from the City or City's Representative to the Contractor <br /> authorizing and directing the Contractor to proceed with the Work and establishing the date on <br /> which the Contract Time begins. Multiple and partial Notices to Proceed may be issued on a single <br /> Project. <br /> Over absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor <br /> performs more overall Work than it otherwise would have performed. <br /> Overhead <br /> In general, Overhead for the purpose of calculating additional compensation under this section of <br /> the Contract shall include only those costs that are expended for the administration of the business <br /> as a whole. Such costs usually accrue or are incurred due to the passage of time, or cannot be <br /> traced to a particular project or contract, or both. <br /> Examples of possible Overhead costs include, but are not limited to, General and Administrative <br /> salaries and benefits, rent, general company insurance, exclusive of insurance on owned <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> ' Work Order#UP3768 SP 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.