My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> equipment that is directly job costed, depreciation on office facilities, utilities, maintenance, office <br /> supplies, general company accounting and legal fees, exclusive of amounts expended directly on <br /> any specific project, personal property taxes, general company business licenses, dues and <br /> subscriptions. <br /> The following costs and expenses are excluded from the definition and calculation of Overhead. <br /> Overhead costs that vary substantially with the volume of Work performed, as measured by <br /> billings, shall not be included in Overhead for the purpose of determining additional compensation <br /> for Extended or Unabsorbed Home Office Overhead, or both. <br /> Examples of costs that are not included in Overhead include: travel and business meetings, <br /> telephones, professional fees expended for the benefit of a specific project, union welfare benefits, <br /> payroll taxes and equipment rental. <br /> If related party transactions are included in a Contractor's Overhead, they must be explicitly I <br /> identified as related party transactions and must not exceed amounts that would be incurred in an <br /> arms-length transaction for the provision of the same or similar goods and services. If such <br /> transactions exist and the amounts paid by the Contractor and included in Overhead are in excess <br /> of that which would normally be expended in an arms-length transaction, an adjustment, in the <br /> form of a reduction in the amount for calculation purposes, must be included in any calculation in <br /> determining the amount of Allocable Overhead. <br /> Overhead shall not include any cost directly attributable to a particular project. If a cost can be <br /> traced to a particular contract, the Contractor may not classify the cost as Overhead. <br /> Indirect or home office costs that vary substantially with the amount of Work performed shall not <br /> be included in the group of costs comprising Overhead. <br /> Overhead shall not include any costs specifically disallowed by Federal Acquisition Regulations, <br /> Subpart 31.2 — Contracts with Commercial Organizations, or its successor. Further, "Overhead" <br /> shall not include the costs of any"field support services"that are more closely direct costs in nature, <br /> regardless of the manner in which the Contractor normally accounts for such costs. An example <br /> of such disallowed cost would be for material handling and expediting, which are costs incurred for <br /> the direct support and benefit of any specific project(s). <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of specific <br /> costs not allowed in a calculation under this Section of the Contract are Incentive Compensation <br /> paid to personnel classified as Overhead and otherwise includable under this Section of the <br /> Contract, travel and business meetings, employer paid benefits and taxes on direct payroll costs <br /> of any project, insurance costs directly identifiable to any specific project, penalties, and any costs <br /> incurred regarding company owned equipment normally classified as a direct project costs,. <br /> Person: Includes individuals, associations,firms, companies, corporations, partnerships, and joint <br /> ventures. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> Provide: Furnish and Install, complete in place. <br /> Punch List: List of incomplete items of Work and of items of Work that do not conform to the <br /> requirements of the Contract Documents. The Punch List is prepared after Substantial <br /> Completion. An Interim Punch List is prepared for work on Port of Everett Property prior to the <br /> Interim Completion Date or as directed by the Engineer. <br /> RCW: Means the Revised Code of Washington <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1-09.9 <br /> PAYMENTS of these Special Provisions. I <br /> Shall: Required conduct. <br /> Shown: Refers to information presented on the Plans, with or without reference to the Plans. <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-6 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.