My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> record drawings. Contractor shall provide data as part of the Work under this Contract and <br /> its acceptability will be determined by the City in its sole discretion. <br /> Further supplement 1-06.1 by adding the following: <br /> 1-06.1(5) Requests for Substitution <br /> ' The City will not usually consider a substitution for material or Equipment specified by brand <br /> name or manufacturer or sole-sourced. <br /> Only the Contractor may offer materials or Equipment of equal or better quality and <br /> performance as a substitution for those specified. The Contractor shall make substitution <br /> offers in writing to the City's Representative in accordance with 1-05.3(1) SUBMITTALS of <br /> these Special Provisions. The substitution offer must include sufficient data to enable the <br /> 1 City's Representative to assess the acceptability of the material or Equipment for the particular <br /> application and requirements. The City and City's Representative are not required or <br /> obligated to consider or review a request for substitution and may, in their sole discretion and <br /> option, consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the Work, <br /> include, if any, drawings and details showing such changes. The Contractor agrees to perform <br /> ' these changes as part of the substitution of material or Equipment at no additional cost to the <br /> City. Approval of a substitution request will not relieve the Contractor from responsibility for <br /> the efficiency, quality, and performance of the substitute material or Equipment, in the same <br /> ' manner and degree as the material and Equipment originally specified. Reflect cost <br /> differential associated with a substitution in the offer. If the City approves the substitution, the <br /> Contract Documents will be modified by a Change Order modifying the Contract Sum in the <br /> amount of the cost differential. <br /> 1-06.2 Acceptance of Materials <br /> ' 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior to use, <br /> the Engineer may accept certain Equipment on the basis of a Manufacturer's Certificate of <br /> Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where compliance to <br /> Contract requirements is not readily determinable through inspection and testing of materials <br /> or Equipment. The Contractor shall provide properly authenticated documents to the City's <br /> Representative that the materials and Equipment comply with the Contract requirements. <br /> ' The Contractor shall pay all associated costs of providing each Manufacturer's Certificate of <br /> Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance. <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.