My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 23,2021 <br /> pursuant to 1-07.18(4) of this section describes limits lower than those maintained by the <br /> Contractor. <br /> Under Section 1-08.5 Time of Completion: <br /> Replace Section 1-08.5(1) General with the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of"calendar <br /> days" stated in the Contract Provisions or as extended by the Engineer in accordance with <br /> Section 1-08.8. <br /> Each calendar day shall be charged to the Contract as it occurs, beginning on the effective <br /> date of the Notice to Proceed, unless otherwise provided in the Contract Documents, until <br /> the Contract Work is physically complete. <br /> The Engineer will give the Contractor written notice of the Physical Completion Date for all <br /> Work the Contract requires. That date shall constitute the Physical Completion Date of the <br /> Contract but shall not imply the City's acceptance of the Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the Contract <br /> after all the Contractor's obligations under the Contract have been performed by the <br /> Contractor. The following events must occur before the Completion Date can be <br /> established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract and required <br /> by law, to allow the City to process final acceptance of the Contract. The following <br /> documents must be received by the Engineer prior to establishing a Completion <br /> Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> and all Subcontractors. <br /> f. A copy of the Notice of Termination sent to the Washington State Department <br /> of Ecology (Ecology); the elapse of 30 calendar days from the date of receipt <br /> of the Notice of Termination by Ecology; and no rejection of the Notice of <br /> ' Termination by Ecology. This requirement will not apply if the Construction <br /> Stormwater General Permit is transferred back to the City in accordance with <br /> Section 8-01.3(16) <br /> I <br /> POE Combined Sewer Main Imp. Addendum No. 1 <br /> Work Order#UP3768 Page 7 of 12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.