My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1,2021 ' <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to 1 additional expense in the event that the Contractor does not complete the work in all <br /> respects and have it ready for use by the completion date stated. Because it is difficult to <br /> accurately compute the amount of such costs and damages, the Contractor hereby <br /> covenants and agrees to pay to the City liquidated damages as computed in Section 1-08.9 <br /> of the Standard Specifications, as may be amended by the Special Provisions;fer-eaeh--ar d <br /> The remainder of Division C—Contract is as provided in Addendum#1. 1 <br /> SPECIAL PROVISION SPECIFICATIONS <br /> Revisions to the Special Provision Specifications are as follows: I <br /> DIVISION 1 —GENERAL REQUIREMENTS: <br /> Revise the third paragraph under GENERAL DESCRIPTION AND LOCATION OF THE I <br /> PROJECT to read as follows: <br /> The Contractor must be thoroughly familiar with and comply at all times with the <br /> City-Port Agreement. For example, the City-Port Agreement allows the Work on the <br /> Port of Everett property only in a defined License Area, and the City-Port Agreement <br /> expires on the City-Port Agreement Expiration Date (as defined in Section 1-01.3). <br /> The Contractor must achieve substantial completion no later than 120 calendar days <br /> • <br /> after the effective date of the Notice to Proceed. The Contractor must complete all <br /> Work on Port of Everett property and achieve physical completion (as defined in <br /> Section 1-01.3) of all work no later than the City-Port Agreement Expiration Date. <br /> Failure to achieve substantial completion or physical completion by those dates may <br /> trigger liquidated damages as described in Section 1-08.9. <br /> Under Section 1-01.3 Definitions: <br /> Revise the definitions listed below to read as follows: <br /> City-Port Agreement Expiration Date: The earliest of the following: <br /> (a) one hundred fifty (150) calendar days after the effective date of the Notice to Proceed <br /> issued to Contractor by the City; <br /> (b) June 30, 2022; or I <br /> (c) thirty (30) days following the Interim Completion Date. <br /> Interim Completion Date: The day the Engineer determines that the Contractor has I <br /> achieved interim completion. Interim completion is achieved when all improvements on <br /> Port of Everett property have been installed, the trench has been backfilled and compacted <br /> with the appropriate soils, and the Port of Everett has the ability to utilize the entire License <br /> Area. <br /> Revise the definition listed below to read as follows, deleting strike-out text: I <br /> Substantial Completion Date: The day the Engineer determines that the Contractor has <br /> achieved substantial completion. Substantial completion means that pipeline construction <br /> is complete with all improvements completely installed; the facilities have been tested, and <br /> POE Combined Sewer Main imp. Addendum No.2 <br /> Work Order#UP3768 Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.