Laserfiche WebLink
December 1,2021 <br /> the trench backfilled and compacted with appropriate soils, the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety <br /> standpoint, and there is no longer a need for construction activities within the Port of <br /> Everett (POE) property, with the Port of Everett having the ability to utilize the entire <br /> License Area. , <br /> property restored to the satisfaction of the Engineer, and only minor incidental work, <br /> Revise the definition listed below to read as follows: <br /> Physical Completion Date: The day all of the Work is physically completed on the project. <br /> This includes, but is not limited to, removal of all stockpiles on City property and restoration <br /> of City property to the satisfaction of the Engineer. All physical work, including Punch List, <br /> is complete and Contractor has completed and fulfilled all contractual obligations except <br /> 111 any maintenance of landscaping. All documentation required by the Contract and required <br /> by law does not necessarily need to be furnished by the Contractor by this date. <br /> Add the following new definition: <br /> Interim Punch List: An Interim Punch List is prepared for each progressive release of the <br /> License Area on Port of Everett Property or as directed by the Engineer. List of incomplete <br /> items of Work and of items of Work that do not conform to the requirements of the Contract <br /> Documents shall be completed within 14 calendar days. <br /> IRevise Section 1-04.1(4) City-Port Agreement as follows: <br /> Delete the sentences that state: <br /> (2) The City.Port Agreement expires on the City-Port Agreement Expiration Date. The <br /> Contractor must achieve physical completion no later than the City-Port Agreement <br /> Expiration Date. <br /> and replace with the following sentences: <br /> (2) The City-Port Agreement expires on the City-Port Agreement Expiration Date. The <br /> Contractor must achieve physical completion no later than the City-Port Agreement <br /> Expiration Date. If the City receives extension(s) of the City-Port Agreement Expiration <br /> Date, the Contractor will receive the same extension(s) for substantial and/or physical <br /> completion, as applicable. <br /> The remainder of Section 1-04.1(4) City-Port Agreement is as provided in Addendum #1. <br /> Revise the first paragraph of Section 1-5.11(1) Substantial Completion Date to read as follows: <br /> All Work must be substantially complete as defined in Section 1-01.3 no laterthan 120 <br /> calendar days after the effective date of the Notice to Proceed. <br /> Supplement Section 1-05.11(2) Final Inspection and Physical Completion Date by adding the <br /> following: <br /> The Contractor must complete Interim Punch List items within 14 days. The Contractor is <br /> required to schedule and complete all other punch list items and repairs and achieve <br /> physical completion for all Work prior to the City-Port Agreement Expiration Date. <br /> POE Combined Sewer Main Imp. Addendum No. 2 <br /> Work Order#UP3758 Page 3 of 5 <br />