My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/30/2021
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KPFF Consulting Engineers 12/30/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:31 AM
Creation date
1/21/2022 2:39:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/30/2021
Council Approval Date
12/22/2021
End Date
12/30/2025
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Later Phase Eclipse Mill Park Project
Tracking Number
0003149
Total Compensation
$600,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
KPFF Consulting Engineers 1/18/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Later Phase Eclipse Mill Project <br /> • Obtain the services of utility potholing subcontractor to verify utility depths <br /> where design engineer determines it necessary. <br /> Subtask 200.2 — Bathymetric Survey (Wilson Engineering) <br /> The CONSULTANT shall perform bathymetric survey to support the analysis and <br /> design of the proposed improvements along the frontage of the Eclipse Mill Park. <br /> Task 300 Geotechnical (WWA Geosciences) <br /> Subtask 300.1 Geotechnical Project Setup <br /> 300.1.1 Project Setup <br /> The CONSULTANT shall initiate the project and set up billing information in <br /> support of invoicing throughout the project. <br /> 300.1.2 Attend Project Kickoff Meeting <br /> The CONSULTANT shall participate in one project kickoff meeting with the CITY <br /> and the design team. This meeting will review project objectives, communication <br /> protocol and schedule. It is assumed that the kickoff meeting will be virtual. <br /> Subtask 300.2 Geotechnical Data Collection <br /> 300.2.1 Collect and Review Existing Geotechnical Information <br /> The CONSULTANT shall collect and review readily available geotechnical and <br /> geological information for the project area including previous geotechnical <br /> borings drilled in support of other projects. <br /> 300.2.2 Geotechnical Site Reconnaissance <br /> To further evaluate site conditions, The CONSULTANT shall undertake a <br /> detailed site reconnaissance of the riverbank area. The site visits will allow us to <br /> assess surface conditions, geologic hazards, and likely subsurface conditions, <br /> from which recommendations for a more-detailed geotechnical evaluation of the <br /> project site can be made. <br /> Subtask 300.3 Geotechnical Explorations <br /> CONSULTANT shall perform geotechnical explorations in support of riverbank <br /> stabilization design for a 400-foot-long section of riverbank along the Lowell <br /> Riverfront Trail. <br /> Plan Geotechnical Field Exploration Program <br /> CONSULTANT shall plan and coordinate the geotechnical exploration program <br /> for the project. The exploration program will consist of drilling a series of limited <br /> access borings along the riverbank, along Lowell Riverfront Trail, to provide <br /> subsurface information in support of design of riverbank stabilization. <br /> 300.3.1 Conduct Utility Locates <br /> The CONSULTANT shall mark the proposed exploration locations and arrange <br /> for utility locates using the Utility Notification Center. A private utility locator will <br /> be utilized on the first day of drilling to ensure no utilities are present at the <br /> drilling locations. <br /> 300.3.2 Generate Geotechnical Exploration Work Plan Memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.