Laserfiche WebLink
Later Phase Eclipse Mill Project <br /> • Obtain the services of utility potholing subcontractor to verify utility depths <br /> where design engineer determines it necessary. <br /> Subtask 200.2 — Bathymetric Survey (Wilson Engineering) <br /> The CONSULTANT shall perform bathymetric survey to support the analysis and <br /> design of the proposed improvements along the frontage of the Eclipse Mill Park. <br /> Task 300 Geotechnical (WWA Geosciences) <br /> Subtask 300.1 Geotechnical Project Setup <br /> 300.1.1 Project Setup <br /> The CONSULTANT shall initiate the project and set up billing information in <br /> support of invoicing throughout the project. <br /> 300.1.2 Attend Project Kickoff Meeting <br /> The CONSULTANT shall participate in one project kickoff meeting with the CITY <br /> and the design team. This meeting will review project objectives, communication <br /> protocol and schedule. It is assumed that the kickoff meeting will be virtual. <br /> Subtask 300.2 Geotechnical Data Collection <br /> 300.2.1 Collect and Review Existing Geotechnical Information <br /> The CONSULTANT shall collect and review readily available geotechnical and <br /> geological information for the project area including previous geotechnical <br /> borings drilled in support of other projects. <br /> 300.2.2 Geotechnical Site Reconnaissance <br /> To further evaluate site conditions, The CONSULTANT shall undertake a <br /> detailed site reconnaissance of the riverbank area. The site visits will allow us to <br /> assess surface conditions, geologic hazards, and likely subsurface conditions, <br /> from which recommendations for a more-detailed geotechnical evaluation of the <br /> project site can be made. <br /> Subtask 300.3 Geotechnical Explorations <br /> CONSULTANT shall perform geotechnical explorations in support of riverbank <br /> stabilization design for a 400-foot-long section of riverbank along the Lowell <br /> Riverfront Trail. <br /> Plan Geotechnical Field Exploration Program <br /> CONSULTANT shall plan and coordinate the geotechnical exploration program <br /> for the project. The exploration program will consist of drilling a series of limited <br /> access borings along the riverbank, along Lowell Riverfront Trail, to provide <br /> subsurface information in support of design of riverbank stabilization. <br /> 300.3.1 Conduct Utility Locates <br /> The CONSULTANT shall mark the proposed exploration locations and arrange <br /> for utility locates using the Utility Notification Center. A private utility locator will <br /> be utilized on the first day of drilling to ensure no utilities are present at the <br /> drilling locations. <br /> 300.3.2 Generate Geotechnical Exploration Work Plan Memo <br />