Laserfiche WebLink
Later Phase Eclipse Mill Project <br /> CONSULTANT shall prepare TESC and Site Preparation plans to address the <br /> demolition or removal of existing features and site grading, incorporating <br /> information made available from the CITY and Shelter Holdings (DEVELOPER). <br /> 600.1.3 Stormwater & Utilities (KPFF) <br /> CONSULTANT shall prepare and submit a memorandum documenting the <br /> proposed improvements and the basis of exemption from the requirements of <br /> flow control, water quality and Low Impact Development (LID) BMPs. <br /> 600.1.4 Utility Coordination (KPFF) <br /> Impacts to existing utilities are not anticipated with the work along the shoreline <br /> and no coordination with utility companies is anticipated to be performed by the <br /> CONSULTANT. <br /> 600.1.5 CSO Outfall Repair! Replacement (KPFF) <br /> CONSULTANT shall provide engineering services to evaluate and design an <br /> extension, if necessary, of the existing Combined Sewer Overflow(CSO) Outfall <br /> to the Snohomish River. <br /> 600.1.06 Waterfront Structures/Amenities (KPFF) <br /> CONSULTANT shall further develop the design of the waterfront structures and <br /> amenities from 2012, including the viewpoint pier, gangway/ramp, floating dock <br /> and debris deflector, including piling support for these structures. The design <br /> calculations and plans shall be updated to meet current industry standards and <br /> governing codes for waterfront structures. <br /> 600.1.07 Relocated Trail Boardwalk <br /> CONSULTANT shall prepare design drawings and calculations for a boardwalk <br /> over wetland areas for the relocated riverbank trail. <br /> 600.1.08 Shoreline Stabilization Design Development (BlueCoast) <br /> The CONSULTANT shall develop up to three concepts for soft shoreline <br /> stabilization along the project shoreline areas in coordination with the <br /> CONSULTANT Team and the CITY. The concepts will be evaluated using <br /> hydrodynamic modeling (see Task 4)to evaluate performance and hydrodynamic <br /> stability. Geotechnical and seismic considerations will also be taken into account <br /> in development of the shoreline concepts. (this work is scoped in other tasks). <br /> Areas of shoreline stabilization include along the Waterfront Park and upstream <br /> limits where the bank has eroded. Soft shoreline stabilization measure will only <br /> be employed in the latter limits if there is insufficient space to simply lay back the <br /> slope. <br /> The CONSULTANT shall develop plan view and typical section figures for each <br /> of the three concepts and a summary comparison matrix for review by the CITY. <br /> Once a preferred option is selected by the CITY, the CONSULTANT shall finalize <br /> the geometry and materials for the preferred option using additional <br /> hydrodynamic modeling (see Task 4). <br /> Subtask 600.2—Prepare 60% Level Design Plan Specifications <br /> The CONSULTANT shall prepare the project specifications in CSI format for the 60% <br /> level design plans. <br />