My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/30/2021
>
Contracts
>
6 Years Then Destroy
>
2025
>
KPFF Consulting Engineers 12/30/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:31 AM
Creation date
1/21/2022 2:39:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/30/2021
Council Approval Date
12/22/2021
End Date
12/30/2025
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Later Phase Eclipse Mill Park Project
Tracking Number
0003149
Total Compensation
$600,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
KPFF Consulting Engineers 1/18/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Later Phase Eclipse Mill Project <br /> CONSULTANT shall address review comments on the Draft Stormwater <br /> Memorandum and submit a final version with the 90% submittal. <br /> CONSULTANT shall prepare a SWPPP and submit with the 90% submittal. <br /> Subtask 700.2 — Prepare 90% Level Design Plan Specifications <br /> The CONSULTANT shall prepare the project specifications (standard specification <br /> and special provisions) for the 90% level design plans. <br /> Subtask 700.3 — Prepare 90% Level Design Plan Engineer's Construction Cost <br /> Estimate <br /> The CONSULTANT shall update the 60% engineer's construction cost estimate <br /> using estimated quantities from the 90% level design plans and review the unit costs. <br /> These costs may be updated based on recent CITY contracts provided to the <br /> CONSULTANT by the CITY, as well as unit cost information obtained from other <br /> industry sources, such as WSDOT unit price analysis, and others, as necessary. <br /> DELIVERABLES: <br /> 1. One (1) set of half-size 90% Plans in PDF format <br /> 2. 90% engineer's construction cost estimate (Excel) <br /> 3. 90% Specifications in CSI format (Word). <br /> 4. Final Stormwater Memorandum <br /> 5. Draft SWPPP <br /> 6. Response to 60% review comments (Excel) delivered with the 90% plan set. <br /> ASSUMPTIONS: <br /> 1. 90% design is not significantly different than the 60% design for the project. <br /> TASK 800 —100% PLANS, SPECIFICATIONS AND ESTIMATE <br /> The CONSULTANT shall develop the 100% level design plans from previous work <br /> completed in the 90% design phase and the project environmental and permitting <br /> processes. The CONSULTANT shall review and provide written responses to CITY <br /> comments on the 90% level design plan submittal and the project environmental and <br /> permitting processes. <br /> Subtask 800.1 — Prepare 100% Level Design Plans <br /> The CONSULTANT shall develop 100% level design plans, as defined in task <br /> subtask 600. Plans shall be prepared to current City standards and other reference <br /> documents. <br /> CONSULTANT shall address comments on the Draft SWPPP and submit the final <br /> with the 100% submittal. <br /> Subtask 800.2— Prepare 100% Level Design Plan Specifications <br /> The CONSULTANT shall prepare the project specifications (standard specification <br /> and special provisions) for the 100% level design plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.