My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:55:14 AM
Creation date
1/25/2022 8:36:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br />CONSTRUCTION <br />INC. <br />June 20, 2018 <br />Tony Lee <br />Building Official <br />City of Everett Public Works <br />3200 Cedar Street <br />Everett, WA 98201 <br />Dear Mr. Lee: <br />This letter is intended to formally request that Interwest Construction Inc. be allowed to <br />submit for our Fill and Grade Permit for our ICI Riverpoint Property Project prior to approval <br />by the Planning Department of the SEPA/Land Use Application submitted on April 2nd 2018. <br />We acknowledge to the City, that Interwest Construction Inc. understands the risks <br />associated with submitting the building permit application prior to approval of the <br />(SEPA)/Land Use Application and further understands that submitting for a building permit <br />does not vest the project or imply that land use approvals will be given. <br />Finally, Interwest Construction Inc. agrees to hold the City of Everett harmless for the loss <br />of paid application fees, design fees, and other fees that may be incurred if the SEPA/Land <br />Use comments cause the project to be altogether denied, affects the timeframe that creates <br />a feasibility issue related to the project or requires additional design modifications <br />subsequent to submittal of the building permit. <br />Sincerely, <br />VP/Operations Manager <br />Roy Swihart <br />nce of Hold Harmless (to be signed by City) Date <br />(360) 757-7574 Fax (360) 757-6464 <br />E-mail: mail@ainterwest.biz <br />609 North Hill Blvd.* Burlington, WA 98233 <br />An Equal Opportunity Employer <br />Contractor License INTERCI121OF <br />
The URL can be used to link to this page
Your browser does not support the video tag.