My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Substitution Procedures <br /> Section 0125 00 <br /> 1.06 PRODUCT SELECTION <br /> A. GENERAL PRODUCT REQUIREMENTS: Provide products that comply with Contract <br /> Documents,that are undamaged and, unless otherwise indicated, unused at the time of <br /> installation. <br /> 1. Provide products complete with all accessories,trim,finish, safety guards and <br /> other devices and details needed for a complete installation and for the <br /> I intended use and effect. <br /> 2. STANDARD PRODUCTS: Where available, provide standard products of types <br /> that have been produced and used successfully in similar situations on other <br /> projects. <br /> B. PRODUCT SELECTION PROCEDURES: Product selection is governed by Contract <br /> Documents and governing regulations, not by previous project experience. Procedures <br /> governing product selection include the following: <br /> ' 1. PROPRIETARY SPECIFICATION REQUIREMENTS: Where only a single product or <br /> manufacturer is named,followed by"no equal", "no substitution", "or no <br /> exception", provide the product indicated. Advise Architect when it is <br /> I 2. discovered that the named product is not a feasible solution. <br /> SEMIPROPRIETARY SPECIFICATION REQUIREMENTS: Where two or more <br /> products or manufacturers are named, followed by"no equals", "no <br /> substitutions", or"no exception", provide one of the products named. Advise <br /> Architect when none of the named products comply with specification <br /> requirements, or are not feasible for use. <br /> 3. NON-PROPRIETARY SPECIFICATION REQUIREMENTS: Where the specifications <br /> name products or manufacturers that are indicative of the type and quality of <br /> the product to be incorporated in the work,followed by the term "or equal",or <br /> similar language,comply with the Contract Documents provisions concerning <br /> "product substitutions"to obtain approval for use of an unnamed product. <br /> 4. DESCRIPTIVE SPECIFICATION REQUIREMENTS: Where the specifications <br /> describe a product or assembly defining the characteristics required, but with or <br /> without use of a brand or trade name, provide products or assemblies that <br /> provide the characteristics indicated and otherwise comply with contract <br /> requirements. <br /> 5. PERFORMANCE SPECIFICATION REQUIREMENTS: Where specifications require <br /> compliance with performance requirements, provide products that comply with <br /> these requirements,which are recommended by the manufacturer for the <br /> application indicated. Submit manufacturer's recommendations contained in <br /> published product literature, or by the manufacturer's individual certification of <br /> performance for approval by Architect. General overall performance of a <br /> I 6. product is implied where the product is specified for specific application. <br /> VISUAL MATCHING: Where matching an established sample is required,the <br /> Owner's decision will be final on whether a proposed product matches <br /> 1 satisfactorily. <br /> a. Where there is no product available within the specified product category <br /> which matches satisfactorily and also complies with other specified <br /> requirements; comply with the provisions of the Contract Documents <br /> Rotary Park Renovation 3 of 6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.