Laserfiche WebLink
1 <br /> Substitution Procedures <br /> Section 01 25 00 <br /> concerning "substitutions"for the selection of a matching product in <br /> another product category. <br /> 7. VISUAL SELECTION: Where specified product requirements include the phrase <br /> "...as selected from the manufacturer's standard colors, patterns,textures..." or <br /> similar phrases, select a product and manufacturer that complies with other <br /> specified requirements. Architect will select the color, patterns and texture <br /> from the product line selected. <br /> 1.07 SUBSTITUTIONS ' <br /> A. GENERAL: If the Contractor desires approval of some material or product other than <br /> that specified,the Contractor may submit a written request for approval of the I <br /> substitute item in accordance with the following requirements. <br /> 1. All such requests shall be submitted in four(4) copies, and must be made on the <br /> "Substitution Request Form", see Section 006325 Substitution Request Form. <br /> 2. No request for approval will be considered unless submitted in accordance with <br /> this Section. <br /> 3. Final decision as to whether an item is an equal or satisfactory substitution rests <br /> with the Owner. <br /> B. REQUESTS FOR APPROVAL: Every request for approval must state whether the item <br /> offered is an equal or better substitution. Each request for substitution must be <br /> referenced to the related specification section and drawing numbers,and be complete <br /> with product data/drawings, description of methods,technical and other information. If <br /> applicable, include samples showing comparison or physical and other pertinent <br /> characteristics as required to establish equivalence of acceptability for the proposed <br /> application. Where specific a test results are required by the Contract Documents,the <br /> comparison data for the proposed item shall be based upon the same test methods as <br /> those specified, or they shall be correlated to clearly demonstrate comparability. The <br /> same warranty described for the specified product is required for the substitution. 1 <br /> C. DURING BID PERIOD: Request for substitutions will not be considered during the bid <br /> period. I <br /> D. AFTER RECEIPT OF BID: Requests for approval of alternative materials or products will <br /> be considered by the Owner for a period of sixty(60)calendar days following date of I <br /> "Notice To Proceed". Within ten (10)calendar days of receipt of Contractor's request for <br /> substitution,the Owner will request whatever additional information or documentation <br /> may be needed for his evaluation of the request. Within twenty(20)calendar days after I <br /> receipt of request, or within one week of receipt of requested additional information or <br /> documentation (whichever is later),the Owner will notify the Contractor of either his <br /> acceptance or his rejection of the proposed substitution. In submitting a request for <br /> substitution,the Contractor agrees to the following: <br /> 1. That the Contractor has personally investigated the proposed substitute product <br /> or material and determined that it is equal or superior in all respects to that <br /> specified. <br /> Rotary Park Renovation 4 of 6 <br /> I <br />