My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 4 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> relieved of responsibility, and the bid security of the Bidder will be returned. <br /> Thereafter, at the discretion of the City, all Bids may be rejected or award made <br /> to next lowest and responsive Bidder. At the discretion of the City, Bidders I <br /> claiming error may or may not be allowed to participate in the re-bid. <br /> 1.9 BID SECURITY , <br /> A. Bid Security in the amount of at least 5 percent of the Total Bid shall accompany <br /> each Bid. This security may be by certified check, cashier's check, or a bid bond <br /> made payable to the City of Everett. A bid bond shall be on the form provided in <br /> the Contract Documents. A bid bond shall not be conditioned to modify the <br /> minimum 5-percent required. The surety shall: (1) be registered with the <br /> Washington State Insurance Commissioner, and (2) appear on the current <br /> Authorized Insurance List in the State of Washington published by the Office of <br /> the Insurance Commissioner. <br /> B. The failure to furnish a bid security of a minimum of 5 percent shall make the Bid <br /> nonresponsive and shall cause the Bid to be rejected by the City of Everett. <br /> C. Bid security shall serve as evidence of good faith and as a guarantee that if <br /> awarded the Contract the Bidder will execute the Contract and provide bonds as <br /> required by the Bid. Should the successful Bidder fail to enter into the Contract, <br /> furnish a satisfactory performance and payment bond, and furnish evidence of <br /> insurance within 14 calendar days after the award date, the certified check, <br /> cashier's check or bid bond shall be forfeited as liquidated damages. <br /> 1.10 LIST OF SUBCONTRACTORS <br /> I <br /> A. Bidder shall complete SECTION 00 4336 — PROPOSED SUBCONTRACTORS , <br /> FORM and submit it with the Bid. <br /> 1 .11 REJECTION OF ANY AND ALL BIDS <br /> A. The City reserves the right to reject any and all Bids. ' <br /> 1.12 RETURN OF BID SECURITY ' <br /> A. Within 15 calendar days after the Bids are opened, the City will return the bid <br /> security accompanying the Bids that are not to be considered in making the <br /> award. All other bid securities will be held until the Contract has been fully <br /> executed; after which they will be returned to the respective Bidders whose Bids <br /> they accompanied. , <br /> 00 2113 - 4 INSTRUCTIONS 'TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.