Laserfiche WebLink
Development Standards: <br /> Q Lot and Building Placement Requirements—Sections 20.200—20.240. <br /> Q Building Form and Design Standards—Sections 20.300—20.340. <br /> • Building Heights—Sections 20.400—20.450. <br /> Q Site and Public Improvement Requirements—Sections 20.500—20.530. <br /> 121 Miscellaneous Provisions Sections 20.800—20.820. <br /> I Off-Street Parking Requirements—Section 33.170. <br /> Q Minimum Setback Requirements—Section 33.180. <br /> Q Building Height and Calculation—Section 33.190. <br /> Q Building Modulation—Section 33.200. <br /> • Roof Lines—Section 33.210. <br /> Q Open Space—Section 33.220. <br /> Q Garages—Section 33.230. <br /> DECISION:The City of Everett Planning Director grants APPROVAL of the proposed design for a new <br /> duplex in the Norton Grand Historic Overlay and the Core Residential Overlay,with deviation from <br /> development standards,subject to compliance with all city,state,and federal regulations.• <br /> June 27,2019 <br /> Allan Giffen, Dire Date <br /> Planning an o unity Development Department <br /> This is an administrative decision that may be appealed to the City's Land Use Hearing Examiner. <br /> For information about appeals,please refer to Everett Municipal Code Chapter 15.24.290,15.24.320, <br /> and 15.24.340. <br /> INFORMATION FOR DEVELOPER: <br /> Engineering/Permit Services Comments:Thad Newport,425.257.8810 <br /> A review of this project by the Engineering/Public Works Division indicates that the following conditions <br /> shall be met: <br /> 1. Construction permits,inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Demolition Permit will be required to be obtained from the Permit Counter prior to any <br /> demolition work.All existing water services will need to be disconnected at the meter prior to <br /> demolition. For all existing side sewers serving the property,a Utility Permit for Side Sewer Cap-Off <br /> must first be obtained from the Permit Services Counter prior to demolition of the building.Side <br /> sewers shall be capped at the property line of the subject property. <br /> Page 2 of 6 <br /> Project No.REVII19-011,REVI19-007 <br /> EVERETT <br />