My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3531 NORTON AVE 2022-02-23
>
Address Records
>
NORTON AVE
>
3531
>
3531 NORTON AVE 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 2:00:35 PM
Creation date
2/15/2022 12:01:35 PM
Metadata
Fields
Template:
Address Document
Street Name
NORTON AVE
Street Number
3531
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. A Public Works Permit is required for this project. Detailed drawings in accordance with the current <br /> City of Everett Design and Construction Standards and Specifications for Development shall be <br /> submitted to the Public Works Department,showing site grading,paving, landscaping, utilities, <br /> storm drainage,temporary construction erosion and sedimentation control(TESC),and all required <br /> improvements in the public right-of-way. Public Works Department approval of these drawings is <br /> required prior to any permits being issued. All improvements shall be completed,approved,and <br /> warranted before the Occupancy Permit is issued/final approval is granted. <br /> 4. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 5. Temporary erosion and sedimentation control(TESC)measures for construction activity must be <br /> operational prior to commencement of any clearing or earthwork.An approved permit and SWPPP <br /> for this work is required prior to set-up of TESC measures on-site.All BMPs must comply with City of <br /> Everett Design and Construction Standards and Specifications for Development. <br /> 6. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding <br /> is not practical due to weather or seasonal restraints,the ground must be covered with mulch as <br /> directed by the City Engineer. <br /> 7. City streets are to be kept clear of dirt and debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> 8. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 9. Stormwater shall be managed in accordance with City of Everett Stormwater Management <br /> Standards current at the time the public works/building permit application package is submitted to <br /> the City for review. <br /> • This project is in the combined storm/sewer area.Currently,the Stormwater code for this area is the <br /> City's 2010 Stormwater Management Manual along with Interim Policy 2-11. <br /> • Chapter 4 of the City's Design and Construction Standards and Specifications for Development <br /> manual contains the City's stormwater Standards. <br /> • The project will be required to evaluate stormwater in accordance with the Minimum Requirements <br /> that this project triggers by following the Flow Charts for Determining Minimum Requirements. <br /> 10. Stormwater system development fees in accordance with Ordinance 3632-18(codified as EMC <br /> 14.08.135)and subsequent revision are applicable.These fees are based on square footage of <br /> proposed new plus replaced hard surface area.Refer to the Utility&System Development Fee <br /> Schedule for estimated fees.The actual charges shall be computed by the Public Works reviewer per <br /> the ordinance in effect at the time and according to the information on the approved plans at the <br /> time of permit issuance. <br /> 11. System development fees for connection to the sewer and water systems in accordance with <br /> Ordinance 3632-18(codified as EMC 14.08.135)and subsequent revision are applicable. These <br /> charges are based on projected water usage and can be substantial. Applicant is encouraged to <br /> obtain a copy of the Ordinance and determine estimated charges prior to permit application. The <br /> Page3of6 <br /> Project No.REVII19-011,REVI19-007 <br /> EVERETT <br />
The URL can be used to link to this page
Your browser does not support the video tag.