Laserfiche WebLink
actual charges shall be computed by the Public Works reviewer per the ordinance in effect at the <br /> time and according to the information on the approved plans at the time of permit issuance. <br /> 12. This project is subject to Transportation Mitigation in accordance with Ordinance 3389-14(codified <br /> as EMC 18.40)and subsequent revision. Applicant is encouraged to obtain a copy of the Ordinance <br /> and determine applicable mitigation fees and/or other requirements prior to building permit <br /> application. The actual charges and requirements shall be as per the information on the approved <br /> plans and an approved Traffic Study at the time of building permit issuance and the ordinance in <br /> effect at that time.You may contact the Traffic Engineering Department for an estimate only of <br /> Mitigation Fees(Michael Brick:425-257-7790, MBrick@everettwa.gov).(Estimate is$2400 per <br /> townhome,with credit for existing residences). <br /> 13. Frontage/roadway/pedestrian/bicycle improvements shall be provided as needed. <br /> 14. Any broken or damaged sidewalk/public right-of-way shall be repaired/replaced in accordance with <br /> current City of Everett Standards and per the City Public Works Inspector. <br /> 15. All sidewalks, ramps,signalized crosswalks,and driveways shall comply with accessibility standards <br /> and City of Everett Standards current at the time of construction. <br /> 16. As-builts of storm sewer,sanitary sewer,and water systems are required to be submitted per <br /> current City of Everett Design and Construction Standards and Specifications for Development <br /> manual,prior to final approval/close out of the permit. <br /> 17. In general,please call out all utilities and site features in accordance with the specific type and <br /> standard drawing number listed in the City's current Design and Construction Standards and <br /> Specifications for Development.https://everettwa.gov/1531/Design-Construction-Standards <br /> 18. Please clearly label all features as either existing or proposed and clearly show on the site plan using <br /> specific line types,hatch patterns,and a legend. <br /> 19. After completing all required Land Use processes,please submit 4 sets of civil plans with your public <br /> works permit application package along with 2 sets of drainage reports,SWPPP's and any additional <br /> reports. Please let me know if you have any questions while putting your plans together. <br /> 20. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> Fire:Steve Goforth,425.257.8100 <br /> 1. Address <br /> a. The project lists an address on Grand. The project is accessed off of Norton and the address <br /> should be off of Norton <br /> b. 16.03.030 Amendments to IFC Chapter 5,Fire Service Features(4)where the building is not <br /> visible from the street or a single access road or private roadway serves more than one building, <br /> Page 4 of 6 <br /> Project No.REVII19-011,REVI19-007 <br /> EVERETT <br />