Laserfiche WebLink
SCOPE OF WORK (continued) <br /> Approach <br /> Parametrix will track and administer the contract of this project, including preparing mont*►ly invoices and <br /> coordinating work efforts with the City's project manager. Parametrix' project manager will have routine phone <br /> and email contact with the City's project manager as needed. <br /> Assumptions <br /> • Project management will extend through December 31, 2023 (24 months). <br /> Deliverables <br /> • Monthly invoices and progress reports. <br /> • QA/QC review documentation (delivered upon request). <br /> TASK 2B. Project Initiation <br /> This purpose of this task is to define the vision, project objectives; establish communications; define data needs <br /> and data gaps; and initiate the SMAP prioritization approach. <br /> Approach <br /> Parametrix will prepare for and facilitate a project kickoff workshop with city staff. Parametrix will lead the first <br /> portion of the workshop, which will include introduction of the project team; definition of the project objectives; <br /> review of the scope of work and schedule milestones; include a deliverable responsibility table; describe the <br /> communications plan; and prepare the risk register. <br /> Parametrix will obtain the needed GIS data from the City to complete the basin information collection elements to <br /> conduct the SMAP. These data include but are not limited to: <br /> • Basin hydrography, including streams and lakes or other receiving water features. <br /> • Basin topography <br /> • Watershed catchment delineations <br /> • Drainage system maps <br /> • Stormwater facility location and type maps <br /> • Land cover. <br /> • Impervious surfaces <br /> • Tax lots with building date <br /> • Public rights of way <br /> • Vacant land maps (if available) <br /> • Developable lands layer(if available) <br /> • Future proposed land use <br /> • Critical areas, such as wetlands,tree coverage, steep slopes or geologic hazards, buffers, and floodplains. <br /> Data not available will be assessed in the data gaps analysis. <br /> City of Everett 556-1844-827 <br /> Stormwater Management Action Plan(SMAP) 2 December2021 <br /> Scope of Work <br />