My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix 1/18/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Parametrix 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 10:21:12 AM
Creation date
2/18/2022 10:20:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix
Approval Date
1/18/2022
Council Approval Date
1/5/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Dana Zlateff
Subject / Project Title
Starmwater Management Action Plan
Public Works WO Number
UT3719--4-3
Tracking Number
0003198
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK (continued) <br /> watershed that is expected to benefit from future implementation of stormwater retrofits, land use strategies, <br /> and other stormwater management activities. <br /> The prioritization process will: <br /> • Include prioritization metrics for review and agreement by the City. <br /> • Confirm restoration or protection goal(s)for each watershed based on watershed characteristics and <br /> protection needs. <br /> • Evaluate current and potential opportunities to address watershed restoration and protection goals for <br /> each watershed (e.g., locations of other City projects, other planning efforts etc.). <br /> • Prioritize watersheds based on agreed metrics using a GIS/spreadsheet scoring tool. <br /> • Estimate the relative investments needed to meet water quality and flow control goals. <br /> • Estimate hydrologic, and pollutant loading impacts from current and future land use combinations. <br /> The prioritization process will determine which watershed will be most cost effective in meeting specific water <br /> quality, biota, and habitat objectives. <br /> Parametrix will work with the City to identify additional, non-quantifiable opportunities and constraints such as <br /> political support,funding applicability, public health and environmental burden, community perception, etc. in <br /> the watershed prioritization. <br /> Based on the prioritization process, one watershed will be identified. <br /> City Check-In Meeting: Parametrix will facilitate a meeting with City staff at the beginning of the City's review <br /> period to present the draft Watershed Prioritization, answer questions, and collect preliminary comments. <br /> Assumptions <br /> • Parametrix will base the prioritization on data collected during Task 1. No new data will be collected for <br /> this effort. <br /> • The City will provide Parametrix with document review comments from all City reviewers consolidated <br /> into a single electronic Excel table file. <br /> • The City will select the preferred watershed for continued analysis. <br /> • A two-page Stormwater Management Action Summary sheet will be created for each action identified <br /> (investments). <br /> • Parametrix will provide AACE Class V cost estimates(Order of Magnitude) based on summary sheets. <br /> • The schedule includes a lag of 10 business days for Ecology review of draft deliverables;however, <br /> Parametrix will continue or suspend effort on this task based on direction by the City. <br /> City of Everett 556-1844-827 <br /> Stormwater Management Action Plan(SMAP) 4 December2021 <br /> Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.