Laserfiche WebLink
SCOPE OF WORK (continued) <br /> • Two 5-minute videos(suitable for posting on social media) <br /> • Up to two postcard mailings <br /> • One infographic(up to two updates) <br /> • Up to two paid ads (3x5 or smaller) <br /> • Up to three articles(less than 300 words)for Web site, blogs and social media. <br /> • Parametrix can provide language translation services if necessary. Parametrix and City will work together <br /> during development of the Outreach Plan to determine which materials and events will require <br /> translation and in what languages. <br /> • For all Ecology submittals(grant deliverables, Permit submittals, etc.), Parametrix will submit documents <br /> to the City, and the City will submit the documents to Ecology. <br /> • <br /> • City will provide preapproval of materials and any printing needs. <br /> Deliverables <br /> • Draft Public Outreach Plan (9-10 pages) <br /> • One story map updated at each schedule milestone <br /> • Up to two each of printed outreach tools (postcards, infographic, signage) <br /> • Up to four each content for social media and Web site <br /> • Up to two 5-minute videos <br /> • Additional graphics support for advertisements. <br /> • Draft public outreach materials to provide the public and stakeholders with an opportunity to comment on <br /> proposed prioritized catchment area(s) (anticipated grant deliverable) <br /> • Documentation of public outreach, collection of stakeholder feedback, City responsiveness to comments <br /> (anticipated grant deliverable) <br /> TASK 3. STORMWATER MANAGEMENT ACTION PLAN <br /> Task 3A. SMAP Report <br /> The purpose of this task is to identify and document high-level stormwater management activities that may <br /> improve the condition of the high-priority watershed identified in Task 3 based on the requirements of Permit <br /> Section S.5.C.1.d.iii. <br /> Approach <br /> Parametrix will develop a SMAP report for one high-priority basin identified in the previous task that includes: <br /> • Concept-level descriptions of potential stormwater facility retrofits recommended for the area, including: <br /> Identification of BMP types (in broad categories such as distributed LID retrofits, regional flow control <br /> facilities, targeted water quality media filtration for pollutants, etc.) <br /> City of Everett 556-1844-827 <br /> Stormwater Management Action Plan(SMAP) 7 December2021 <br /> Scope of Work <br />