My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix 1/18/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Parametrix 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 10:21:12 AM
Creation date
2/18/2022 10:20:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix
Approval Date
1/18/2022
Council Approval Date
1/5/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Dana Zlateff
Subject / Project Title
Starmwater Management Action Plan
Public Works WO Number
UT3719--4-3
Tracking Number
0003198
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK (continued) <br /> • Two 5-minute videos(suitable for posting on social media) <br /> • Up to two postcard mailings <br /> • One infographic(up to two updates) <br /> • Up to two paid ads (3x5 or smaller) <br /> • Up to three articles(less than 300 words)for Web site, blogs and social media. <br /> • Parametrix can provide language translation services if necessary. Parametrix and City will work together <br /> during development of the Outreach Plan to determine which materials and events will require <br /> translation and in what languages. <br /> • For all Ecology submittals(grant deliverables, Permit submittals, etc.), Parametrix will submit documents <br /> to the City, and the City will submit the documents to Ecology. <br /> • <br /> • City will provide preapproval of materials and any printing needs. <br /> Deliverables <br /> • Draft Public Outreach Plan (9-10 pages) <br /> • One story map updated at each schedule milestone <br /> • Up to two each of printed outreach tools (postcards, infographic, signage) <br /> • Up to four each content for social media and Web site <br /> • Up to two 5-minute videos <br /> • Additional graphics support for advertisements. <br /> • Draft public outreach materials to provide the public and stakeholders with an opportunity to comment on <br /> proposed prioritized catchment area(s) (anticipated grant deliverable) <br /> • Documentation of public outreach, collection of stakeholder feedback, City responsiveness to comments <br /> (anticipated grant deliverable) <br /> TASK 3. STORMWATER MANAGEMENT ACTION PLAN <br /> Task 3A. SMAP Report <br /> The purpose of this task is to identify and document high-level stormwater management activities that may <br /> improve the condition of the high-priority watershed identified in Task 3 based on the requirements of Permit <br /> Section S.5.C.1.d.iii. <br /> Approach <br /> Parametrix will develop a SMAP report for one high-priority basin identified in the previous task that includes: <br /> • Concept-level descriptions of potential stormwater facility retrofits recommended for the area, including: <br /> Identification of BMP types (in broad categories such as distributed LID retrofits, regional flow control <br /> facilities, targeted water quality media filtration for pollutants, etc.) <br /> City of Everett 556-1844-827 <br /> Stormwater Management Action Plan(SMAP) 7 December2021 <br /> Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.