surface). Direct discharge of surface water runoff to the combined system will not be <br /> allowed. <br /> i. The downstream analysis needs to be revised to state that the flow in the Tulalip line is <br /> directed to Lift Station 2,located in the Port property west of Bond Street,which pumps the <br /> flow to the wastewater treatment plant for treatment prior to discharge to the Snohomish <br /> River/Puget Sound. Lift Station 2 overflows to Puget Sound Outfall no. 7,which is a <br /> combined sewer outfall. <br /> j. Revise page 13,paragraph 1 of the Drainage Report: Minimum requirement#6 is not <br /> required because this project discharges to the combined system,which directs flow to the <br /> treatment plant for treatment prior to discharge to the river/Puget Sound. <br /> k. Revise the drainage report and site plan and resubmit for review during the construction <br /> permitting process. <br /> 22. Stormwater features,facilities, and conveyance serving the individual lots shall be private upstream <br /> of the detention facility.Roadway conveyance structures and the detention facility itself shall be <br /> public with an easement granted to the City of Everett for maintenance. <br /> 23.In general,please call out all utilities and site features in accordance with the specific type and <br /> standard drawing number listed in the City's current Design and Construction Standards and <br /> Specifications for Development manual. A PDF version of this document can be found on our <br /> website: https://everettwa.gov/permits under Quick Links on the right-hand side. <br /> 24. Please also clearly label all features as either existing or proposed and clearly show on the site plan <br /> using specific line types,hatch patterns, and a legend. <br /> 25. After receiving preliminary short plat approval,please submit 4 sets of civil plans with your public <br /> works permit application package along with 2 sets of drainage reports, SWPPP's and any <br /> additional reports. <br /> FIRE DEPARTMENT COMMENTS—JIM VENTURO <br /> 1 Access O.K. as shown on the site plan reviewed. Access to lots 1, 2, 3, 4, 5, 6, and 7 are <br /> acceptable. <br /> 2 Access to the structure on this lot will be excessive. This may be mitigated by the installation of a <br /> residential sprinkler system in compliance with the requirements of NFPA Standard (3D. A <br /> minimum 1-inch domestic water service meter is required. <br /> Plans for such a system shall be submitted to the Engineering&Public Services <br /> Department and the Fire Department for review and approval prior to commencement of <br /> construction. <br /> A final "in the bucket" and alarm bell test,witnessed by a fire inspector, will be performed prior <br /> to acceptance of the system. Call(425)257-8124 or(425)257-8120 for more information. <br /> Access to lot 8 requires "131)" sprinkler system due to long,narrow driveway, <br /> Note: Access to lot 9 is excessive. Highly recommend a fire alarm system at Rucker Mansion for <br /> early detection. <br /> Preliminary Approval <br /> Project No.S 18-001 <br /> / <br />