Laserfiche WebLink
Component Performance Path, pg. 1 ENV-UA <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: AD Systems Warehouse Addition Date 08/11/2017 <br /> Calculation Adjustments For Building Department Use <br /> None Applied <br /> Fenestration Area as%gross above-grade wall area 0.3% Max.Target: 30.0% <br /> Skylight Area as%gross roof area 0.9% Max.Target: 3.0% <br /> Vertical Fenestration Alternates: None Selected on ENV-SUM <br /> Envelope Component Proposed UA Target UA <br /> Cavity+Cl Plan/Detail# U-factor Source&Table#2 U-factor x Area(A) =UA(U x A' U-factor x Area(A)= UA(U x A) <br /> R= 0.027 <br /> R= Above Deck Insulation U-0.027 <br /> a <br /> R= <br /> o R= 1/A5.0 0.031 20158 624.9 0.031 20158 624.9 <br /> co— <br /> R= Metal Building U-0.031 <br /> 0° 2 R= <br /> ° R= 0.027 <br /> R= Joist/single rafter U-0.027 <br /> • <br /> R= <br /> R= 0.021 <br /> R= Single raft,attic,other U-0.021 <br /> R= <br /> R= 0.055 <br /> a) <br /> R= Steel/metal frame U-0.055 <br /> cn <br /> R= <br /> Ti) -o R= 1/A5.0 0.052 15563 809.3 0.052 15563 809.3 <br /> R= Metal Building U-0.052 <br /> R= <br /> ° O R= 0.054 <br /> a <br /> o R= Wood Frame,other U-0.054 <br /> o <br /> R= <br /> ° R= 0.104 <br /> m R= Mass Wall U-0.104 <br /> O R= <br /> R= 0.200 <br /> R= Mass Transfer Deck U-0.20 <br /> m <br /> F R= <br /> R= 0.078 <br /> p_ N <br /> o R= Group R Mass Wall U-0.078 <br /> 0 R= <br /> R= 0.104 <br /> -0 E R= Assumed to be Mass Wall U-0.104 <br /> o o <br /> ° U R= <br /> R= 0.078 <br /> m o- R= Assumed to be Mass Wall U-0.078 <br /> 2 <br /> R= <br /> R= 0.031 <br /> m R= Mass Floor U-0.031 <br /> o R= <br /> ° R= 0.029 <br /> R= Joist/Framing U-0.029 <br /> LL R= <br /> Area' UA Area' UA <br /> Page 1 Subtotal 35721 1434 35721 1434 <br /> Component Performance Compliance (UA) <br /> 3// � <br />