Laserfiche WebLink
Component Performance Path, pg. 2 ENV-UA <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: AD Systems Warehouse Addition Date 08/11/2017 <br /> Fenestration Area as%gross above-grade wall area 0.3% Max.Target: 30.0% For Building Department Use <br /> Skylight Area as%gross roof area 0.9% Max.Target: 3.0% <br /> Building Component Proposed UA Target UA <br /> Ins. R Plan/Detail# F-factor Source&Table#8 F-factor x Perimeter =UA(U x A) F-factor x Perimeter= UA(U x A) <br /> R= 0.540 538 290.7 0.540 538 290.7 <br /> r R= Slab-On-Grade F-0.54 <br /> R= <br /> o -a R= 0.550 <br /> m <br /> -° R= Heated Slab-On-Grade F-0.55 <br /> ( a> <br /> = R= <br /> Schedule ID U-factor Source910 U-factor x Area(A) =UA(U x A' U-factor x Area(A)= UA(U x A) <br /> 0.37 <br /> co <br /> Opaque Swing Doors U-0.37 <br /> c <br /> NO) <br /> o <br /> 0 OH Manufacturer 0.136 460 62.6 0.34 586 199.2 <br /> HM ENV Requirements 0.370 126 46.6 Opaque rollup&sliding U-0.34 <br /> 0 <br /> m A I ENV Requirements 0.30 48 14.4 0.30 48 14.4 <br /> Non-Metal Frame U-0.30 <br /> 0 <br /> z <br /> -0i 0.38 <br /> c Metal Frame, Fixed U-0.38 <br /> o <br /> as <br /> m a) <br /> N 2 <br /> aJ <br /> a a 0.40 <br /> m 0 Metal Frame,Operable U-0.40 <br /> U_ a <br /> 2 <br /> 0.60 <br /> f2 Metal Entrance Door U-0.60 <br /> a) <br /> ENV Requirements 0.50 183 91.5 0.50 183 91.5 <br /> T All types U-0.50 <br /> H <br /> V) Q <br /> Area' UA Area' UA <br /> Page 2 Subtotal 1355 506 1355 596 <br /> Page 1 Subtotal 35721 1434 35721 1434 <br /> TO COMPLY-The Proposed Total UA shall not <br /> exceed the Target Total UA. Project Total 37076 1940 37076 2030 <br /> Component Performance Compliance (UA) <br /> Note 1-If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1, then Target Area Adjustment of all applicable envelope <br /> elements will be calculated automatically by the compliance form. Refer to Target Area Adjustments worksheet for this calculation. <br /> Note 2-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 3-Proposed CMU mass wall in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target U-value of 0.014 <br /> Note 4-For semi-heated spaces utilizing the wall insulation exception,enter Target Wall U-factors under Proposed Wall U-factors so exterior <br /> walls are neutral to the calculation. <br /> Note 5-Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br /> Note 6-Demising walls, doors,and vertical fenestration separating spaces with different degrees of space conditioning(unconditioned,semi-heated, <br /> fully conditioned)shall be included only on the ENV-UA form for the space with the greatest degree of space conditioning. <br /> Note 7-List Group R above grade mass walls here. List all other mass walls, Commercial and Group R, in the Opaque Walls-Above Grade section. <br /> Note 8 -Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 9 -Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.A door is defined as <br /> opaque if less than 50%of the door area has glazing. <br /> Note 10-Fenestration assembly U-Factors shall be the manufacturer's NFRC product rating, which includes the glazing and frame, or shall be <br /> the default value per Section C303.1.3. <br /> (11//// <br />