My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 2/3/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
Brown and Caldwell Inc. 2/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 10:07:01 AM
Creation date
3/11/2022 1:15:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
2/3/2022
Council Approval Date
2/2/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility Engineering
Tracking Number
0003228
Total Compensation
$4,407,152.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell, Inc. 9/27/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Port Gardner Storage Facility Scope of Work 1-06-22 <br /> Phase 230 - Demolition Basis of Design <br /> Objective: Under this phase, BC discipline leads will identify the demolition criteria necessary for <br /> design and construction of wet weather storage facility. Building from the recommendations <br /> developed under the Demolition Alternatives Analysis (Phase 220),the design team will develop <br /> detailed recommendations for which structural, process mechanical, electrical, and civil site features <br /> will be retained, demolished, or abandoned in place.The information developed under this task will <br /> be presented in a Demolition Basis of Design Report(BODR)to inform demolition final design (Phase <br /> 250). <br /> Activities/Approach:This task includes the following activities: <br /> • Based on the results of the demolition Alternatives Analysis conducted in Phase 220, <br /> develop a basis of design report that identifies the specific structural, process mechanical, <br /> electrical, instrumentation and controls, and civil infrastructure that will be either maintained <br /> or demolished to support construction of the PGSF. Example elements the design team will <br /> review include process piping, process equipment(mixers, pump, etc.), buildings and <br /> structural features, electrical conduits, and buried infrastructure.Specific facilities that will <br /> be reviewed to identify specific demolition criteria and extents include: <br /> o Neutralization basins <br /> o Chemical storage building and supporting equipment <br /> o Aeration basins and process piping <br /> o Secondary clarifiers <br /> o Blower building <br /> o Site electrical <br /> • Develop plan for sequencing of demolition activities. <br /> • Develop criteria for tagging existing equipment that will be retained for future use. <br /> • Develop criteria for staging existing equipment for future use. Example staging includes <br /> installing pull cords in existing conduits to accommodate installation of new wiring. <br /> • Develop the BODR that also meets the requirements of a project report defined by the <br /> Washington State Department of Ecology(DOE). The BODR will define the demolition design <br /> criteria for structural, process mechanical, building mechanical, electrical, and <br /> instrumentation and controls disciplines. <br /> • Contact DOE to define expectations and schedule for submittals to DOE for project approval. <br /> • Conduct workshop with City staff to review the basis of design for facility demolition. <br /> • Develop preliminary list of demolition design drawings and specifications. Lists will be <br /> included as an appendix to the demolition BODR. <br /> Task Assumptions <br /> • This task assumes complete demolition of the following facilities: <br /> o Sludge/effluent pump station <br /> o Gravity thickeners <br /> o Storage building <br /> Everett Responsibilities <br /> • Provide input on the recommended demolition improvements. <br /> • Review and provide comments on the BODR/DOE project report. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.