My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 2/3/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
Brown and Caldwell Inc. 2/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 10:07:01 AM
Creation date
3/11/2022 1:15:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
2/3/2022
Council Approval Date
2/2/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility Engineering
Tracking Number
0003228
Total Compensation
$4,407,152.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell, Inc. 9/27/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Port Gardner Storage Facility Scope of Work 1-06-22 <br /> operating and maintenance (0&M) costs of the facility and a basis design. <br /> Task Assumptions <br /> • TMs will be 5 -10 pages each on average and included as appendix to the Site Design <br /> Alternatives Analysis Report. <br /> • Alternatives Analysis Report will be a summary of the approach and conclusion of the TMs <br /> and approximately 10 pages. <br /> Everett Responsibilities <br /> • Provide consolidated review comments on TMs and draft Alternatives Analysis. <br /> Meetings <br /> • Workshops covered under Phase 300. <br /> Work Products <br /> • Flushing System TM, draft and final <br /> • Pre-screening and Grit Removal TM, draft and final <br /> • Pumping Systems TM, draft and final <br /> • Control Strategy and Monitoring TM, draft and final <br /> • Stormwater Management TM, draft and final <br /> • Odor Control TM, draft and final <br /> • Electrical and Standby Power TM, draft and final <br /> • Architectural Concepts and Criteria TM, draft and final <br /> • Project Delivery TM, draft and final <br /> • Alternatives Analysis Report, draft and final <br /> Phase 319 -Stormwater Treatment Concept Design <br /> Objective Assess, refine, evaluate, and analyze prior stormwater improvement facility alternatives <br /> into a modified recommended stormwater facilities improvements plan to carry forward into <br /> preliminary design. <br /> Activities/Approach: <br /> • Visit the Port Gardner area and perform field reconnaissance of stormwater drainage basins <br /> potentially tributary to the Port Gardner stormwater treatment facility. <br /> • Conduct hydrologic analysis of the separated and potentially separated tributary stormwater <br /> drainage basins (Sewer M, Grand Ave Phase 1 and 2, and Rucker Hill, other drainage areas <br /> such as Marine View Drive).Analysis will be completed using continuous simulation modeling <br /> (MGSFlood or WWHM)to estimate required design flows (conveyance and treatment) and the <br /> targeted 91% annual water quality treatment volume. <br /> • Summarize resulting preliminary design flows (conveyance and treatment) and water quality <br /> treatment volumes. <br /> • Provide a range of treatment rates and equalizing storage volumes to achieve the annual <br /> water quality treatment volume. <br /> • Establish design criteria for stormwater influent conveyance drain and effluent storm water <br /> pump stations. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.