Port Gardner Storage Facility Scope of Work 1-06-22 <br /> • Establish pretreatment(screening and grit) criteria. Remote at basin pretreatment will be <br /> evaluated strictly for the Sewer M basin. If remote pretreatment is the preferred option, the <br /> other drainage basins will need to incorporate the pretreatment in the design when the storm <br /> drainage infrastructure is developed. <br /> • Develop the stormwater treatment system configuration including stormwater conveyance, <br /> high flow bypass, pretreatment, equalization storage, biofiltration treatment, and influent and <br /> effluent pumping. <br /> • Develop stormwater treatment hydraulic profiles through the proposed stormwater treatment <br /> train considering tailwater conditions associated with pumping of treated stormwater flows to <br /> the deep-water outfall. <br /> • Prepare for and attend two design development coordination meetings with BC and the City, <br /> with the outcome being selection of a recommended stormwater improvements plan. <br /> • Prepare Stormwater Treatment Design Report documenting outcomes of the analysis and <br /> recommendations.The report will include the stormwater treatment system Basis of Design <br /> that may be incorporated in the overall PGSF Basis of Design under Task 320. This will <br /> provide a basis for estimating the construction and annual operating and maintenance <br /> (0&M) costs of the facility and a basis design. <br /> Task Assumptions <br /> • Field visit will be up to two days for 2 HDR stormwater staff and the HDR project manager. <br /> • Pretreatment screening options will be evaluated at the basin level and at PGSF. <br /> • The alternatives analysis will be limited to the evaluation of pretreatment options and the <br /> limits of the potential watershed. <br /> • The watershed area for the Port Gardner Stormwater Treatment Facility is based on the four <br /> basins in Figure 5-37 of the Conveyance Alternative Technical Memorandum (Appendix D) of <br /> the Port Gardner Storage Facility Engineering Report.These basins include Sewer M (131 <br /> Acres), Grand Ave Phase 1 (18 Ac), Grand Avenue Phase 2 (59 Acres)and Rucker Hill (100 <br /> Ac). <br /> • Biofiltration will be based on the GULD approved Filterra Bio-Scape technology. <br /> • HDR will summarize improvement component quantities and equipment needs (with vendor <br /> quotes as needed)for input to BC OPCC cost opinions development for the stormwater <br /> improvements <br /> • A draft and final version of the Stormwater Treatment Design Report(10 pages in length plus <br /> figures)will be prepared in response to a single BC and City review and comment iteration. <br /> • Design development coordination meetings will be 2 hours in duration and will be attended <br /> by 2 HDR stormwater staff and the HDR project manager. <br /> • The content from the technical memorandums will be incorporated into the Stormwater <br /> Treatment Design Report with review comments addressed. <br /> • The first coordination meeting will review the potential watershed,facility sizing and <br /> pretreatment options, and pretreatment options. <br /> • The second meeting will review the treatment system configuration and design development. <br /> • Final Stormwater Treatment Design Report will be provided with the 30% Design under <br /> Phase 350. <br /> 19 <br />