Port Gardner Storage Facility Scope of Work 1-06-22 <br /> Work Products <br /> • Civil Design Criteria TM, draft and final. <br /> • Architectural Design Criteria TM, draft and final. <br /> • Structural Design Criteria TM, draft and final. <br /> • Process Mechanical Design Criteria TM, draft and final. <br /> • Odor Control Design Criteria TM, draft and final. <br /> • Building Mechanical Design Criteria TM, draft and final. <br /> • Electrical Design Criteria TM, draft and final. <br /> • Electrical Classifications TM, draft and final. <br /> • Instrumentation and Control Design Criteria TM, draft and final. <br /> • Combined Sewer Influent TM, draft and final. <br /> • Combined Sewer Debris Removal TM, draft and final. <br /> • Stormwater Storage and Treatment TM - See Phase 350. <br /> • Site Electrical TM, draft and final. <br /> • Site Civil TM, draft and final. <br /> • CS Storage - Aeration Basins TM, draft and final. <br /> • CS Storage - Clarifiers TM, draft and final. <br /> • Effluent Pump Station TM, draft and final. <br /> • Operations Building TM, draft and final. <br /> • Basis of Design Report, draft and final. <br /> Note: TMs may be combined for similar subject matter, to be determined prior to work under this <br /> phase. <br /> Phase 340 - Preliminary Design <br /> Objective: Obtain approval from the City on the general arrangement of the proposed design; develop <br /> the overall process configuration from schematic to spatial configuration.This phase includes <br /> completion of all major Process, Electrical, and Instrumentation schematics, diagrams, and <br /> calculations. Civil, Structural and Process Mechanical models of all major process areas have been <br /> developed. Provide updated construction cost estimate and construction schedule. <br /> The preliminary design documents will be prepared under the following subtasks, each of which will <br /> follow the same scope described below: <br /> • Subtask 341-Combined Sewer Influent <br /> • Subtask 342-Combined Sewer Debris Removal <br /> • Stormwater storage and treatment - See Phase 350 <br /> • Subtask 344-Site electrical <br /> • Subtask 345-Site civil <br /> • Subtask 346-Combined Storage-Aeration Basins <br /> • Subtask 347-Combined Storage-Clarifiers <br /> • Subtask 348- Effluent Pump Station <br /> • Subtask 349-Operations building <br /> 22 <br />