Port Gardner Storage Facility Scope of Work 1-06-22 <br /> Activities/Approach: Develop design documents considering results of demolition phase and <br /> recommendations, decisions, and design criteria of previous phases. Design will be consistent with <br /> that described in previous prepared reports,technical memorandums, and demolition drawings. <br /> Design models and drawings will conform to the project-specific CAD standards and BXP developed <br /> under Phase 300. Drawings prepared for the preliminary submittal is assumed to include the <br /> following: <br /> • Preliminary site plan (including grading,stormwater and sanitary layouts) <br /> • Process and building facilities general arrangements <br /> • At least one structural/general elevation view of each structure (without architectural <br /> treatments) <br /> • Draft process schematics <br /> • Draft P&IDs <br /> • Draft hydraulic profile <br /> • Preliminary electrical diagrams <br /> • Process equipment lists <br /> • Proposed conduit and pipe alignments <br /> • Pipe sizes and connections to existing pipes <br /> Consultant will prepare a Design Memorandum that describes any changes to the design <br /> assumptions and criteria in the BODR, description of resolved and outstanding issues, and a <br /> discussion of any further field work or investigations that may be required to advance to <br /> intermediate design. Consultant will provide an updated design schedule and identify delays and <br /> action required or taken to meet the timeline for the start of construction. <br /> Other activities in this phase include: <br /> • Develop control narratives to supplement P&IDs. <br /> • Update base map and existing conditions models to reflect starting conditions after <br /> demolition phase has been executed. <br /> • Hydraulic profile calculations for all unit process and gravity flow components. <br /> • Equipment sizing and selection. <br /> • Proposed list of specification sections and a draft of those equipment sections and common <br /> work results that are most important to the project. <br /> • Develop data sheets and lists for gates, piping, valves and instrumentation. <br /> • Provide support, such as equipment vendor quotes,to construction cost estimating in Phase <br /> 400. <br /> Task Assumptions <br /> • Preliminary design package will be delivered as one complete review package without <br /> respect to construction delivery methods or phasing. Phasing or other packaging will be <br /> incorporated in future (intermediate or final) design phases. <br /> • Technical specifications will be prepared in Division 50 CSI master format using BC <br /> standards. <br /> • General and Supplementary Conditions will use the demolition package versions. <br /> • As a discipline dependent on architectural and structural layouts, building mechanical design <br /> will be advanced in intermediate design phase using other disciplines preliminary designs <br /> and design criteria developed in BODR phase. <br /> 23 <br />