Laserfiche WebLink
,71`=r Treatment Plant Portal 4 Impro, c.,,±- I Scope of`,"ar4< <br /> control of Consultant.Actual bids received and costs incurred may vary from the estimate ranges <br /> prepared by Consultant. All estimates are expressly implied to have 90 to 95% confidence limits. <br /> • Task includes a contingency for a third party review of the geotechnical reports (Earth <br /> Mechanics). <br /> Meetings <br /> • Final design (90%) review workshop. Assume workshop will be attended by six BC staff for a <br /> duration of two hours. <br /> • Assume three site visits attended by two BC staff for a duration of four hours on site. <br /> Work Products <br /> • This task includes development of final (90%) and bid (100%) design documents. The design <br /> plan set will include approximately 34 drawings including general sheets, notes, symbols and <br /> legends, and specifications. <br /> • The Issue for Bid deliverable will contain all drawings and specifications required for bidding. The <br /> Issue for Bid package will be stamped/sealed and digitally signed. Issue for Bid Documents will <br /> be provided in electronic format for full-size and half-size document production. <br /> • CAD files of final designs. <br /> • AACEI Class 1 construction cost estimate. <br /> Task 601 Geotechnical Services <br /> Activities/Approach: Provide geotechnical services in support of the design of the new valve vaults <br /> and vaults and to assess condition of the slope above the Portal 4 structure. The following section <br /> summarizes the geotechnical scope of work. A full description of the geotechnical services is <br /> included as Attachment A. <br /> • Review existing geotechnical reports and data for the project area. <br /> • Explore and classify the subsurface soil conditions within the vicinity of the proposed valve and <br /> vault installation locations. <br /> • Investigate the slide on the hill side southeast of the Portal 4 structural to inform mitigation. This <br /> investigation will provide information for general site and/or slope stability modifications. <br /> • Develop geotechnical engineering recommendations for design and construction of the new <br /> valve and vault locations, including_ <br /> o Construction dewatering <br /> o Temporary excavation slopes/support <br /> o Vault foundations <br /> o Groundwater elevations <br /> o Structural fill <br /> o Seismic considerations <br /> • Two(2) geotechnical borings (40 feet deep) at the location of the valve/vaults and one (1) <br /> geotechnical boring(60-80 feet deep) near the slide on the hill side southeast of the Portal 4 <br /> structure. <br /> Everett Responsibilities <br /> • Provide site access, staffing, and resources to support field work conducted by geotechnical <br /> crews. <br /> Task Assumptions <br /> • Geotechnical investigations require two site visits for utility locates prior to the field explorations. <br /> Page 9 of 13 <br />