Laserfiche WebLink
• Participate in workshops. <br /> • Supply relevant operations data, wholesale purveyor agreements, and control strategies. <br /> Task Assumptions <br /> • Recommendations will provide the basis for the control strategy and design of the control valves <br /> in Portal 4. <br /> • Recommendations will be developed through a review of supplied documents by others and BC's <br /> ongoing work on the Finished Water Pump Station and through the associated workshops with <br /> the City. No additional hydraulic modeling or numerical analysis will be needed. <br /> Meetings <br /> • North Corridor operations workshop. Assume attended by three BC staff, with a duration of two <br /> hours, conducted via video conference. <br /> • North Corridor recommendations workshop. Assume attended by three BC staff, with a duration <br /> of two hours, conducted via video conference. <br /> Work Products <br /> • North Corridor Flow Controls Evaluation, Alternatives, and Recommendations technical <br /> memorandum, draft and final. <br /> Task 300 Basis of Design <br /> Activities/Approach: BC will perform evaluations to finalize all major design decisions and provide <br /> design criteria and equipment selections for the Portal 4 improvements. This information will be <br /> presented in a Basis of Design Report. <br /> Amendment 1 updates to Task 300 account for work completed under the basis of design phase for <br /> additional project elements not accounted for in the original scope of work. This work includes the <br /> installation of isolation valves and vaults on transmission lines 2, 3, and 4 and the addition of a <br /> security fence around the Portal 4 structure as described in the BODR. The addition of valves and a <br /> security fence also required development of draft scopes of work for survey and geotechnical <br /> subconsultants which were presented as appendices in the BODR. This task encompasses work <br /> completed by the process mechanical discipline, civil discipline, and design manager for the added <br /> project elements at Portal 4. Specific task activities include: <br /> • Conduct site visit to verify field conditions and interview Plant Staff to confirm scope of <br /> improvements needed. <br /> • Evaluate suitability of re-using existing 2" conduit and existing cable vs new conduit and/or <br /> cable and review potential alternative route(s)for upgrading buried electrical service to Portal 4. <br /> • The Portal 4 design package will include the following improvements: <br /> • Replace/repair corroded structural elements.Analyze structure for required repairs. <br /> • Remove rust stains. Evaluate coating options. <br /> • Replace door <br /> • Remove and seal off louver openings <br /> • Cover open channel and vent to atmosphere <br /> • Replace/upgrade electrical equipment <br /> • Improve electrical service to Portal. <br /> • Add mechanical ventilation system for the room and/or channels (assume no heating <br /> required) <br /> • Install flow control valves with remote monitoring and operation. Evaluate condition and <br /> capacity of existing valves, actuators,telemetry, and PLC system. <br /> Page 4 of 13 <br />