r"it rr t Water Treatment Plant Portal 4 Improvements I Scope of Work <br /> • Work products will be electronic. <br /> • Existing 2" conduit and cable providing power from the WFP to Portal 4 can be reused and does <br /> not require replacement. <br /> • Amendment 1 budget includes reapportionment of preliminary design fees previously shifted to <br /> surveying services Task 603 by the budget reallocation dated December 3, 2021. <br /> • The Amendment 1 budget includes reapportionment of intermediate design fees previously <br /> shifted to geotechnical services Task 601 by the December 3, 2021 budget reallocation. <br /> • Electrical cable cost estimating assumes in-kind replacement of the existing single phase cable <br /> and use of the existing buried conduit. <br /> Meetings <br /> • Design comment review call. Assume attended by five BC staff, with a duration of two hours, <br /> one each at preliminary (30%) and intermediate design (60%) stages. <br /> • Site visit during design as needed.Assume attended by two BC staff, with a duration of two <br /> hours on site. <br /> Work Products <br /> • Preliminary Design (30%) <br /> • Intermediate Design (60%) <br /> • CAD files of intermediate designs. <br /> • ACEI Class 5 construction estimate. <br /> Task 450 Isolation Valves, Security Fence, and Cable Replacement Preliminary and Intermediate <br /> Design <br /> Activities/Approach:This task covers work to be completed by civil and process mechanical <br /> disciplines for the preliminary and intermediate design of isolation valves and vaults on transmission <br /> lines 2, 3, and 4,the Portal 4 security fence, and in-kind replacement of the single phase power <br /> cable servicing Portal 4.This work is a continuation of conceptual design presented in the BODR <br /> completed under Task 300 and mirrors preliminary and intermediate design activities of Task 400. <br /> Task Assumptions <br /> • BC will carry out preliminary and intermediate design of the isolation valves, the security fence, <br /> and cable replacement in parallel with the intermediate design phase of the other project <br /> elements. <br /> • Upon completion of Task 450, intermediate design documents for the isolation valves, vaults, <br /> security fence, and cable replacement will be integrated into the core intermediate design for <br /> delivery to the City as a single package. <br /> • No preliminary design documents for the transmission line valves, vaults, security fence, and <br /> cable replacment will be developed. <br /> • Dewatering and shoring design will be responsibility of contractor. <br /> • Valve vaults will not require design of deep foundations. Additional design budget will be <br /> necessary if deep foundations are required. <br /> • Electrical cable design assumes in-kind replacement of the existing single phase cable. The new <br /> cable will be installed in the existing buried 2-inch diameter conduit. <br /> • BC assumes the electrical cable routing and access points presented in the March 2003 Portal <br /> 4 Modifications as-built drawing sheet E105A are accurate and will serve as a reference for the <br /> cable replacement design. <br /> Page 7 of 13 <br />