Laserfiche WebLink
0 <br />0 <br />EVERETT <br />WASHINGTON <br />September 11, 2020 <br />CITY OF EVERETT <br />Permit Services <br />Mr. Ismail Mohammad <br />Email Address: ismail.seattle@gmail.com <br />RE: Owner: 3608 Rucker Avenue, LLC <br />Job Address: 3608 Rucker Avenue <br />Plan Check Number: B2004-028, Second Building Review <br />Dear Mr. Mohammad, <br />We have reviewed the responses to the First Review letter dated July 8, 2020. Multiple comments <br />have not been completely addressed and require additional action before a permit can be issued. <br />The comments are itemized for consistency with the original review letter. These comments <br />address building issues only. Additional revisions or additions may be required by other <br />departments including Public Works, Planning, and Fire. <br />Code citations provided in the following comments reference the Everett Municipal Code (EMC), <br />2015 International Residential Code (IRC), 2015 International Building Code (IBC), and the <br />residential provisions of the 2015 Washington State Energy Code (WSEC). Amendments to the <br />building codes by the Washington Administrative Code (WAC) are identified. Citations provided in <br />the comments reference the IRC unless noted otherwise. Web -based versions of these documents <br />can be viewed the following web addressed: <br />• EMC: https://www.codepublishing.com/WA/Everett/ <br />• WAC: https://apes.lea.wa.gov/wac/default.aspx?cite=51 <br />• 2015 IRC: https://codes.iccsafe.org/content/IRC2015 <br />• 2015 IBC: https://codes.iccsafe.org/content/IBC2015 <br />• 2015 WSEC: http://www.energy.wsu.edu/BuildingEfficieng//EnerayCode.aspx <br />• 2015IPMC: https://codes.iccsafe.org/content/IPMC2015 <br />In order for the processing of your application to continue, the following documentation should be <br />submitted to Permit Services for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents should contain sufficient information and detail to review the proposed project <br />for compliance with the building codes. Upon submittal of the revised documents, your application <br />will be given priority and the review will recommence. <br />Page 1 of 3 <br />