My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7702 RAINIER DR 2022-04-05
>
Address Records
>
RAINIER DR
>
7702
>
7702 RAINIER DR 2022-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 3:42:18 PM
Creation date
4/5/2022 3:40:46 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> MAINTENANCE ACTIVITIES <br /> The purpose of this maintenance program is to ensure the success of the mitigation plantings. <br /> The planting areas will be maintained in spring and fall of each year for the five years <br /> monitoring period. Maintenance activities will include the following as necessary: <br /> • Plant inspection and replacement <br /> • Control invasive species <br /> • Remove trash <br /> • Replace mulch <br /> Following each monitoring visit, the project biologist will make recommendations for <br /> maintenance. Any replanting will be done by property owner and should be done during the fall <br /> maintenance. Maintenance should be done by hand to avoid impacts to establishing plants and <br /> existing habitat. <br /> CONTINGENCY PLAN <br /> If it is determined at any time during the monitoring period that the goals of the mitigation plan <br /> are not being met, a contingency plan will be devised to improve or alter those elements that <br /> are deficient. If measures beyond standard maintenance are required, a plan containing these <br /> measures will be approved by the City of Everett prior to implementation. <br /> FINANCIAL ASSURANCE <br /> A performance bond (assurance device) shall be provided to the City of Everett in the amount <br /> of 90% of the estimated cost for plant material and labor, monitoring, and maintenance. This <br /> bond shall be released at the end of five years upon a successful determination by the City of <br /> Everett for all portions of this mitigation project.This project shall be considered successful if it <br /> meets the performance standards listed in this plan. The following is an estimate of plant <br /> materials and labor only.This does not represent a bid to install. <br /> TOTAL QUANTITY OF 1-GALLON PLANTS @$10.50 EACH 105 <br /> ESTIMATED COST OF PLANT MATERIAL AND LABOR $1,102.50 <br /> ESTIMATED COST OF MONITORING (5 YEARS @ $500/yr.) $2,500.00 <br /> ESTIMATED COST OF MAINTENANCE (5 YRS. @ $500/yr.) $2,500.00 <br /> TOTAL ESTIMATED COSTS $6,102.50 <br /> Acre Environmental Consulting, LLC October 29,2015 <br /> CAS& Buffer Mitigation Plan for—Kymera Inc.-7702 Rainier Drive <br /> Everett,WA Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.