My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> native material for trench backfill and furnishing, placing and 1 <br /> compacting imported backfill material. No extra payment shall be <br /> made for removing, loading, hauling, and disposing of displaced and <br /> unsuitable material. <br /> 4. Furnish and install custom fabricated couplings as shown on the <br /> Plans. <br /> 4. Trench patch per COE Standard Plan 326. <br /> 5. Core drilling and connecting DI pipe to SDMH and filling annual space <br /> with non-shrink grout (full depth) or mechanical seal as shown on the <br /> Plans. <br /> 6. Steel sheeting for covering open excavations left overnight to protect <br /> public from injury and property damage. <br /> 7. Maintenance, restoration and/or relocation, if required, of existing <br /> culverts, storm drainage pipe, other utilities and structures affected by <br /> construction that are to remain. <br /> 8. Ethafoam pads or sand backfill between water main and other pipes. <br /> 9. Maintenance of existing utilities. <br /> 10. furnishing and installing marking tape and tracer wire over pipe. <br /> 11. Extra depth, including excavation, backfill and compaction required to , <br /> clear known buried utilities or other known obstacles. <br /> 12. Work required to avoid unexpected or unforeseen utilities shall be <br /> paid for under the Bid Item "Resolution of Utility Conflicts". The costs <br /> for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no <br /> direct compensation made. <br /> Bid Item 20. Full Profile Insertion Mag Flow Meter <br /> The lump sum (LS) Contract Price bid for"Full Profile Insertion Mag Flow ' <br /> Meter" shall constitute full compensation for all Work, labor, materials, tools, <br /> and equipment necessary to furnish and install the full profile insertion mag <br /> flow meter as shown on the Plans and as required by the Specifications, and <br /> includes, but is not limited to preparing area on concrete cylinder pipe for <br /> quarter round saddle, furnishing and install quarter round saddle on concrete <br /> cylinder pipe, and patching concrete cylinder pipe. <br /> Electrical conduit(s) and cable for the flow meter and converter is included in <br /> the electrical bid item. <br /> Bid Item 21. Insertion Flow Meter Manhole, Type 3, 72-Inch f <br /> The unit Contract Price bid per each (EA)for"Insertion Flow Meter Manhole, <br /> Type 3, 72-Inch" shall constitute full compensation for all Work, labor, <br /> materials, tools, and equipment necessary to furnish and install the manhole <br /> as shown on the Plans or as required by the Specifications, and includes, but <br /> is not limited to excavation, haul and proper disposal of excavated materials, <br /> hand digging as necessary around the existing 36-inch concrete cylinder <br /> pipe, installing manhole, placing sand material inside the manhole, placing <br /> CDF around outside of manhole, placing and compacting native or import ' <br /> City of Everett 01 22 20-14 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.