Laserfiche WebLink
1 <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> disposal of excavated materials, placing concrete footings, installing and ' <br /> filling bollards, and coatings. <br /> Bid Item 26. Relocate Leak Detection Pipe and Meter ' <br /> The lump sum (LS) Contract Price for"Relocate Leak Detection Pipe and <br /> Meter" shall constitute full compensation for all Work, labor, materials, tools, <br /> and equipment necessary to relocate leak detection pipe and meter as shown <br /> on the Plans or as required by the Specifications, and includes, but is not <br /> limited to excavating, placing and compacting pipe bedding and trench <br /> backfill material, installing PVC pipe and fittings, connecting new pipe ends to <br /> existing leak detection pipe with couplings, connecting existing meter to new <br /> PVC pipe, and installing gate valve, valve box, and nut extension at meter <br /> location. <br /> Bid Item 27. Erosion/Water Pollution Control <br /> The lump sum (LS) Contract Price for"Erosion/Water Pollution Control" shall <br /> constitute full compensation for all Work, labor, materials, tools and <br /> equipment necessary and incidental for the installation, maintenance and <br /> removal of the temporary erosion and sedimentation control (TESC)facilities <br /> to prevent pollution, erosion, siltation, and damage to any wetland, stream, <br /> other watercourse, or surrounding property throughout the life of the Contract. <br /> TESC facilities shall include, but not be limited to, any cover measures, runoff <br /> control measures, soil and site stabilization measures, filter fabric fencing as <br /> shown on the Plans, and inlet protection measures for the work area and <br /> downstream areas, per City Standard Plans 210 and 214. <br /> The TESC measures shall limit the erosion possibility by covering disturbed ' <br /> soils, preventing sloughing or raveling of cut and natural slopes, and <br /> controlling surface runoff from flowing into excavations using measures such <br /> as curbs, berms, dikes, rock-lined ditches, and other approved measures. , <br /> Filter fabric fence shall be used to treat small areas of non-concentrated <br /> runoff prior to discharge from the site. <br /> Bid Item 28. Soil Quality and Depth ' <br /> Measurement shall be computed from field measurements. <br /> The unit Contract Price per square yard (SY)for"Soil Quality and Depth" ' <br /> shall constitute full compensation for all Work, labor, materials, tools, <br /> equipment, and incidentals necessary to provide soil quality and depth on <br /> disturbed or graded areas as shown on the Plans, Specifications, and City <br /> Standard Plan 202or as necessary for the work. The unit contract price <br /> includes scarifying subsoil, mixing compost into stockpiled topsoil, placement <br /> of soil mix, amending existing topsoil, and hydroseeding all disturbed areas. <br /> Hydroseed on disturbed or graded areas as shown on the Plans, per WSDOT <br /> Standard Specifications Section 8-01, and City Standard Plan 202 or as <br /> necessary for the work. 1 <br /> Also included in this bid item is watering to establish and maintain grass <br /> growth. <br /> Bid Item 29. Concrete Block Retaining Wall <br /> City of Everett 01 22 20-16 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 1 <br />