Section 01 22 20 MEASUREMENT AND PAYMENT <br /> Measurement of Concrete Block Retaining Wall shall be based on lineal foot <br /> of wall constructed. <br /> ' The unit Contract Price per linear foot (LF)for"Concrete Block Retaining <br /> Wall" shall constitute full compensation for all Work, labor, materials, tools, <br /> ' and equipment necessary to construct the wall in accordance with the Plans <br /> and Specifications. <br /> The unit price for this bid item includes all costs for excavation and haul for <br /> ' wall construction, placing and compacting base and wall backfill aggregate <br /> material, furnishing, placing, and compacting 3-inch washed gravel and weed <br /> block fabric, furnishing and placing PVC perforated and solid wall drain pipe, <br /> and coring SDMH and connecting PVC drain to manhole, including filling <br /> annular space with non-shrink grout (full depth) or installing a mechanical <br /> seal. The PVC perforated and solid-walled drain pipe shown in the concrete <br /> block retaining wall details is incidental to this bid item and is not included in <br /> Bid Items 17 and 18. <br /> Payment for furnishing CSTC will be made under the bid item "Crushed <br /> Surfacing Top or Base Course." <br /> Bid Item 30. Electrical Building Structure <br /> Measure and Payment: Lump Sum <br /> The lump sum (LS) bid price for"Electrical Building Structure" shall constitute <br /> ' full compensation for all work, labor, materials, tools, equipment, and <br /> incidentals necessary to construct the electrical building structure complete <br /> as shown on the Plans and specified in the Project Specifications. The bid <br /> price shall include but not be limited to: <br /> r • Excavation of all materials of whatever nature encountered <br /> • Excavation and grading to reshape and finish grade where shown on the <br /> plans and as required by field conditions <br /> • Placing and compacting base material under the building <br /> • Hauling and properly disposing of any excess material, including securing <br /> approved disposal site <br /> • Placing, and mechanical compaction of import CSBC material under slab. <br /> • Maintenance and restoration of construction area and of other utilities <br /> affected by construction <br /> t • Grading and preparation of slab on grade, foundation wall and footing <br /> materials, formwork and reinforcement <br /> • Installation of plumbing, water, drainage and process mechanical piping <br /> and appurtenances that involve slab penetrations or are to be buried <br /> beneath and within the confines of the building foundation <br /> • Delivery, placing, finishing and quality control of concrete materials and <br /> any other items necessary to complete the Work in conformance with the <br /> Contract Documents <br /> • Furnishing and installing a complete CMU wall system, including grouting, <br /> insulation, and reinforcement <br /> • Furnishing and installing a complete metal roof system, including <br /> structural support members to mount roof to the walls and translate <br /> ' structural loads to the foundation and perimeter gutter system <br /> City of Everett 01 22 20-17 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />