My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 21 13 INSTRUCTIONS TO BIDDERS <br /> the originals used in the preparation of the Bid. City staff will review the certified <br /> work sheets to determine the validity of the claimed error and make a <br /> recommendation. If the City concurs in the claim of error, the Bidder will be <br /> relieved of responsibility, and the bid security of the Bidder will be returned. <br /> Thereafter, at the discretion of the City, all Bids may be rejected or award made <br /> to next lowest and responsive Bidder. At the discretion of the City, Bidders <br /> claiming error may or may not be allowed to participate in the re-bid. <br /> 1.09 BID SECURITY <br /> A. Bid Security in the amount of at least 5 percent of the Total Bid shall accompany I <br /> each Bid. This security may be by certified check, cashier's check, or a bid bond <br /> made payable to the City of Everett. A bid bond shall be on the form provided in <br /> the Contract Documents. A bid bond shall not be conditioned to modify the <br /> minimum 5-percent required. The surety shall: (1) be registered with the <br /> Washington State Insurance Commissioner, and (2) appear on the current <br /> Authorized Insurance List in the State of Washington published by the Office of <br /> the Insurance Commissioner. <br /> B. The failure to furnish a bid security of a minimum of 5 percent shall make the Bid <br /> nonresponsive and shall cause the Bid to be rejected by the City of Everett. <br /> C. Bid security shall serve as evidence of good faith and as a guarantee that if <br /> awarded the Contract the Bidder will execute the Contract and provide bonds as I <br /> required by the Bid. Should the successful Bidder fail to enter into the Contract, <br /> furnish a satisfactory performance and payment bond, and furnish evidence of <br /> insurance within 14 calendar days after the award date, the certified check, <br /> cashier's check or bid bond shall be forfeited as liquidated damages. <br /> 1.10 LIST OF SUBCONTRACTORS I <br /> A. Bidder shall complete Section 00 43 36 — Proposed Subcontractors Form and <br /> submit it with the Bid. <br /> 1.11 REJECTION OF ANY AND ALL BIDS <br /> A. The City reserves the right to reject any and all Bids. 1 <br /> 1.12 RETURN OF BID SECURITY <br /> A. Within 15 calendar days after the Bids are opened, the City will return the bid ta, <br /> security accompanying the Bids that are not to be considered in making the <br /> award. All other bid securities will be held until the Contract has been fully <br /> executed; after which they will be returned to the respective Bidders whose Bids <br /> they accompanied. <br /> 1 <br /> I <br /> City of Everett 00 21 13-4 January 2022 1 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.