McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> or decreasing throughout the creep load hold period. <br /> 3. Failure does not occur at the 1.67 DL maximum test load. Failure is <br /> defined as the load at which attempts to further increase the test load <br /> simply result in continued pile movement. <br /> M. If a proof-tested micropile fails to meet the acceptance criteria, the <br /> Contractor shall immediately proof test another micropile within area. For <br /> failed piles and further construction of other piles, the Contractor shall <br /> modify the design, the construction procedure, or both. These <br /> modifications may include installing replacement micropiles, post-grouting <br /> the tested pile and re-proof testing the pile, modifying installation <br /> methods, increasing the bond length, or changing the micropile type. Any <br /> modification that necessitates changes to the structure design shall <br /> require the Engineer's prior review and acceptance. Any modifications of <br /> design or construction procedures, or cost of additional verification test <br /> piles and verification and/or proof load testing, or replacement production <br /> micropiles, shall be at the Contractor's expense. <br /> Item 25 - SPECIFICATION 40 71 13, FULL INSERTION MAGNETIC FLOW METER, <br /> Page 3 <br /> the following sections are REVISED as follows: <br /> 2.01.A.1 — McCrometer, Model 39-54C Bidirectional full profile insertion <br /> electro-magnetic flow meter (no substitutes). I <br /> 2.02.A— The sensor probe shall be installed in line on the 36-inch concrete <br /> cylinder water transmission line pipe and provide Bard-bidirectional flow <br /> measurements. <br /> 2.02.C.2 — Include a modbus and an LCD readout for local measurement <br /> display, a 4 to 20 milliamp signal to allow operator to remotely read flow. <br /> Item 26 - SPECIFICATION 40 90 00, PROCESS CONTROL SYSTEM GENERAL <br /> PROVISIONS I <br /> Specification 40 90 00 is ADDED to the specifications and is provided as an <br /> attachment to Addendum 3. 1 <br /> Item 27 - GEOTECHNICAL ENGINEERING REPORT ADDENDUM, Appendix Al. <br /> An addendum to the geotechnical report is ADDED to the Specifications, <br /> Proposal, and Contract Documents as Appendix Al and is provided as an <br /> attachment to Addendum 3. 1 <br /> I <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 12/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.