My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> C. The System Integrator shall configure the fiber optic telemetry connection and set ' <br /> up and test all communications with the City's master SCADA system. <br /> D. The System Integrator shall be responsible for the final design and assembly of 1 <br /> the entire l&C system. The system shall be designed to provide the control <br /> capabilities and functions indicated and implied by the plans and these <br /> specifications and to provide trouble-free operation with minimum maintenance. <br /> The system shall readily enable manual operation of any and all functions in the <br /> event of failure of any one component. <br /> 1.04 REFERENCES <br /> A. All equipment and materials shall conform to the latest revised editions of <br /> applicable standards published by the following organizations: <br /> 1. American National Standards Institute (ANSI). <br /> 2. Institute of Electrical and Electronic Engineers (IEEE). <br /> 3. National Electrical Manufacturer's Association (NEMA). <br /> 4. Underwriters' Laboratories (U/L). , <br /> 5. Instrument Society of America (ISA). <br /> B. All electrical equipment and materials, and the design, construction, installation, ' <br /> and application thereof shall comply with all applicable provisions of the National <br /> Electrical Code (NEC), the Occupational Safety and Health Act (OSHA), and any <br /> applicable Federal, State, and local ordinances, rules and regulations. <br /> C. All materials and equipment specified herein shall within the scope of UL <br /> examination services, be approved by the Underwriter's Laboratories for the <br /> purpose for which they are used and shall bear the UL label. <br /> D. All control panels shall bear a label by UL or by a Washington State Department <br /> of Labor and Industries approved testing agency for the suitability of the <br /> assembled panel. <br /> 1.05 SHOP DRAWINGS ' <br /> A. General Requirements <br /> 1. Arrangement drawings shall be drawn to scale using standard <br /> Architectural or Engineering scales. <br /> 2. Shop drawings shall be provided in pdf format on sheets no larger than ' <br /> 11" X 17". Shop drawings shall include specific product detail such as <br /> rating, size, and number of contacts, etc. Wiring diagrams shall be <br /> included for all components in the system including control equipment <br /> supplied with mechanical devices. <br /> B. The System Integrator shall develop any shop drawings required for design, <br /> fabrication, assembly and installation of the control panels. Shop drawings shall <br /> include all drawings required in manufacture of specialized components and for <br /> City of Everett 40 90 00-2 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.