My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> ' assembly and installation of them. Shop drawings shall include detailed "end-to- <br /> end" control wiring diagrams showing all interface of field equipment and <br /> instrumentation. In addition, the following drawings shall be provided: <br /> ' 1. CONTROL CABINET LAYOUT DRAWINGS: The System Integrator shall <br /> develop shop drawings for the control cabinets and wiring and terminals <br /> within the control cabinets to show all details of the control system. <br /> ' Drawings shall include scaled drawings of both interior and exterior <br /> elevation views. All components shall be identified by both the nameplate <br /> information and also the component number related to the bill of <br /> ' materials. <br /> 2. EQUIPMENT AND INSTRUMENT WIRING DIAGRAMS: The System <br /> Integrator shall provide individual wiring diagrams (one drawing)for each <br /> field instrument and for each controlled motor load. All wiring interface for <br /> each instrument or equipment shall be shown on a single drawing* and <br /> the drawing shall be titled with the equipment or instrument name and <br /> ' number. Each drawing shall include field devices, PLC I/O and motor <br /> control, etc. associated with that instrument or equipment. Include all <br /> terminals, terminal numbers, wire numbers (both internal and field), PLC <br /> I/O and memory address, and equipment TAG number. <br /> *for instruments of the same type - if space allows then more than one <br /> instrument of the same exact type may be shown on a single drawing. <br /> ' This exception applies for instruments only, not for equipment. <br /> 3. CARD DRAWINGS: The System Integrator shall provide the information <br /> for each input and each output of the PLC on "PLC Card drawings". All <br /> details of each card must be shown on a single drawing —one I/O card <br /> per drawing*. Each I/O point shall be designated with the memory <br /> address, point id tag number, point description and wiring diagram <br /> ' reference drawing number. <br /> *cards of the same type — if space allows, then more than one card of the <br /> same exact type may be shown on a single drawing. <br /> ' 4. TERMINAL ARRANGEMENT DRAWINGS: Provide terminal layout <br /> drawings that show the layout of all terminals in the cabinet. <br /> C. Shop drawings shall be drawn in AutoCAD and include the following: <br /> 1. Technical data sheets for all components with the complete part number <br /> ' of the component clearly designated with all required options. <br /> 2. Arrangement drawings of all cabinet front-mounted and internal-mounted <br /> ' instruments, switches, devices, and equipment indicated. Show all panel <br /> mounting details required. Include outer dimensions of all panels on the <br /> drawing. Deviations from approved arrangements require resubmittal and <br /> approval prior to installation. <br /> D. Installation details shall include the size, number, type and location of <br /> interconnecting wiring and conduit, installation of cabinets and enclosures, <br /> City of Everett 40 90 00-3 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> ' Issued for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.