My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> format of all shop drawings on a flash jump drive or other <br /> transmission means to the Owner. Include the AutoCAD dwg <br /> drawing with the following submittals: <br /> 1) Approval submittals, <br /> 2) Revised approval submittals (if needed), <br /> 3) Final as-built drawings. <br /> c. I/O checklist that verifies that all control and status/indication <br /> points in the control panels both implemented and spare have <br /> been tested. One copy of the I/O Checklist shall be submitted for <br /> the start of the Factory Test. One copy of the I/O Checklist shall <br /> be submitted prior to the Control system startup. The PLC Card <br /> drawings shall be used for this purpose. <br /> d. Provide reference numbering on all cut sheets to relate them to <br /> the bill of materials. Provide same reference numbering by the <br /> equipment shown on the shop drawings. <br /> 1.07 COORDINATION WITH OTHER EQUIPMENT <br /> A. The System Integrator shall be responsible for obtaining all necessary <br /> information/product data (wiring diagrams, load data, etc.)for other equipment <br /> and instrumentation used in the project that requires integration into the telemetry <br /> and control system —even for equipment and instrumentation outside the System <br /> Integrator's scope of supply. This may include, but is not limited to (ATS, flow <br /> transmitters and other instrumentation, control valves, motor data, etc.) <br /> B. System wiring diagrams shall include information from other equipment. <br /> C. See PART 4 of this section for additional requirements. <br /> 1.08 NAMEPLATES <br /> A. Nameplates shall be provided on all electrical devices—(equipment, instruments, <br /> boxes, etc.). <br /> B. Nameplates shall also be provided on all electrical panel interior and exterior <br /> equipment (including but not limited to: relays, I/O cards, circuit breakers, power <br /> supplies, terminals, contactors, switches, indicating lights, buttons, meters, and <br /> other devices.) <br /> C. Equipment nameplates shall have both the equipment name and number and <br /> equipment circuit number (if applicable). <br /> D. Instrument Nameplates: Provide nameplates for all instruments with instrument <br /> name, number, and the circuit breaker, or fuse location for the power source. For <br /> nameplates that cannot be attached to the instrument provide a stainless-steel <br /> cable ring to attach it to the instrument. <br /> City of Everett 40 90 00-5 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.