My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> PART 3 : EXECUTION I <br /> 3.01 INSTALLATION <br /> A. GENERAL <br /> 1. The instrumentation and control system shall be installed, in accordance <br /> with the Drawings, installation details, and also instructions prepared by <br /> the System Integrator, and per special instruction from equipment or <br /> instrumentation Manufacturers. <br /> 2. The Integrator shall provide detailed installation drawings and wiring <br /> diagrams for this purpose. <br /> 3. Installation shall include all elements and components of the I&C system I <br /> and all conduit and interconnecting wiring between all elements, <br /> components, and sensors. <br /> 4. Provide instrument calibration sheets for all instruments to verify function, <br /> range, setpoints etc. <br /> a. For analog instruments include range information and test at 0, <br /> 25%, 50% 75% and 100%. Unless otherwise shown set displays <br /> as follows —for level measurement in FEET, for pressure in PSI, <br /> for flow GPM. <br /> b. For switches verify operation and check setpoint for correct <br /> operation —for floats verify trip level, pressure switch settings, etc. <br /> 3.02 FACTORY TESTING & INSPECTION 111 <br /> A. Prior to delivery to the site, the power & control panels shall be tested by the <br /> System Integrator. All control devices shall be operated, and the cabinet shall be <br /> powered with rated incoming voltage for at least 2 days. Simulating equipment <br /> shall be provided and wired into the control cabinet system for this testing. The <br /> entire control system shall be interconnected as it will be installed in the field. If <br /> the actual equipment is not available, then simulation equipment shall be <br /> provided to fully demonstrate the functionality of the system. The System <br /> Integrator shall test all functionality of the system and verify proper operation of <br /> the hardware and software. <br /> B. Following the System Integrators testing, the power & control panel shall be <br /> tested and inspected by the Design Engineer prior to shipment to the project site. <br /> The testing shall include, but not be limited to, operation of all input and output <br /> (I/O) points, control devices and motor controllers and demonstration of all <br /> control functions with the actual equipment or via a simulation. The System <br /> Integrator shall revise, modify, adjust the system as required by the Engineer <br /> during the testing period. The System Integrator shall inform and coordinate the <br /> time of the testing with the Engineer at least 4 weeks prior to the testing date. <br /> C. The System Integrator shall provide working space, a 6-foot table and 2 <br /> office/desk chairs for the test Engineers. I <br /> D. If the Integrator's shop where the factory testing will take place is more than 100 <br /> City of Everett 40 90 00-14 January 2022 I <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid u <br />
The URL can be used to link to this page
Your browser does not support the video tag.