I <br /> Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> c. Submit all associated test and calibration forms (Instrument, <br /> motor, wire, etc.). <br /> d. Run all motors (in HAND) to verify correct operation and rotation. <br /> e. Provide all equipment and instrument labels per spec. <br /> f. Test operation of"packaged sub systems". <br /> 3. Prior to any equipment being put into automatic operation, every digital <br /> and analog input and output shall be tested for correct operation and <br /> witnessed by the Owner's representative. The Contractor shall provide a <br /> set of the PLC Card drawings and instrument and control wiring diagrams <br /> on 81/2x11" sheets for a check-off list of all inputs and outputs. If a point <br /> cannot be verified within 5 minutes of starting the check that point shall be <br /> noted as a punch list item to be corrected and re-tested at a later time. <br /> 4. Definition: Successfully I/O Tested. A piece of equipment of system <br /> shall be considered "successfully I/O tested" when all of the I/O for that <br /> equipment has been tested and verified by both the programmer and the <br /> Owner's representative and checked off of the wiring diagrams or PLC I/O <br /> card drawings. Note: The City must witness and verify all I/O testing. <br /> 5. Once all I/O associated with a piece of equipment of system has been <br /> successfully tested, then the equipment or system will be deemed ready <br /> for program testing. I <br /> 6. INPUTS: <br /> a. The Contractor shall simulate an actual field condition whenever <br /> possible to provide both the digital and analog signal inputs into <br /> the PLC and these will be verified by the programmers. Where an <br /> actual field simulation is not practical, then the Contractor shall <br /> jumper the digital inputs at a point closest to the field device as <br /> possible and shall use an analog loop simulator for analog inputs. <br /> b. Analog inputs shall be tested at 0, 25%, 50%, and 100% of full <br /> range. <br /> 7. OUTPUTS: <br /> a. The programmer will simulate outputs from the PLC and the I <br /> Contractor shall verify the field operation of the output. The field <br /> operation verification shall be by actual operation of equipment <br /> when possible. When actual field operation of equipment is not I <br /> practical for verification, then the Contractor shall use volt and <br /> amp metering to verify digital and signal outputs. <br /> b. Analog outputs shall be tested at 0, 25%, 50%, and 100% of full I <br /> range. <br /> D. PROGRAM TESTING <br /> 1. The Contractor shall provide field support to the programmer for testing of <br /> the program. The Contractor shall provide field simulation of equipment <br /> as needed by the programmer to test all monitoring and alarm functions <br /> of the programming. The Contractor shall anticipate that the program <br /> City of Everett 40 90 00-16 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid <br />