My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> 5. Replacement of components <br /> 6. Automatic mode operation <br /> 7. Manual mode operation <br /> 8. System schematics/shop drawings <br /> 9. Electronic copy on CD ROM of all shop drawings in AutoCAD version <br /> 2018 or newer <br /> 10. As-built wiring diagrams of cabinet and enclosure contained assemblies <br /> 11. Catalog data and complete parts list for all equipment and control devices <br /> 12. Listing of recommended spare parts <br /> 13. Listing of recommended maintenance tools and equipment. <br /> B. Two (2) hard copies of the entire O&M manual shall be provided. <br /> C. Two (2) copies of the entire O&M manual shall be provided in electronic PDF <br /> format on CD ROMs. <br /> 3.09 RECORD DRAWINGS <br /> A. The System Integrator shall be responsible to provide a clean and neatly marked <br /> up set of record drawings showing any changes from the submittal and <br /> Drawings. The Contractor shall provide a hard copy of the final as-built drawings <br /> and wiring diagrams in the PLC cabinet for each pump station. These drawings <br /> shall be provided prior to final approval of the project and release of the <br /> retainage. <br /> I <br /> I <br /> I <br /> l <br /> I <br /> I <br /> rCity of Everett 40 90 00-19 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.