Laserfiche WebLink
I <br /> Section 40 90 00 PROCESS CONTROL SYSTEM GENERAL PROVISIONS <br /> 5. Replacement of components <br /> 6. Automatic mode operation <br /> 7. Manual mode operation <br /> 8. System schematics/shop drawings <br /> 9. Electronic copy on CD ROM of all shop drawings in AutoCAD version <br /> 2018 or newer <br /> 10. As-built wiring diagrams of cabinet and enclosure contained assemblies <br /> 11. Catalog data and complete parts list for all equipment and control devices <br /> 12. Listing of recommended spare parts <br /> 13. Listing of recommended maintenance tools and equipment. <br /> B. Two (2) hard copies of the entire O&M manual shall be provided. <br /> C. Two (2) copies of the entire O&M manual shall be provided in electronic PDF <br /> format on CD ROMs. <br /> 3.09 RECORD DRAWINGS <br /> A. The System Integrator shall be responsible to provide a clean and neatly marked <br /> up set of record drawings showing any changes from the submittal and <br /> Drawings. The Contractor shall provide a hard copy of the final as-built drawings <br /> and wiring diagrams in the PLC cabinet for each pump station. These drawings <br /> shall be provided prior to final approval of the project and release of the <br /> retainage. <br /> I <br /> I <br /> I <br /> l <br /> I <br /> I <br /> rCity of Everett 40 90 00-19 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> Issued for Bid <br />