My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT <br /> D. The Measurement and Payment for the following Bid item descriptions apply to ' <br /> the corresponding Bid items as included in the Proposal: <br /> Bid Item 1. Mobilization , <br /> The lump sum (LS) Contract Price for"Mobilization" shall constitute complete <br /> compensation for all of Contractor's preconstruction costs of preparatory work <br /> and operations including, but not limited to, those necessary for the <br /> movement of his personnel, equipment, supplies and incidentals to the <br /> Project; for the establishment of his offices, buildings and other facilities <br /> necessary for Work on this Project; for premiums on bonds and insurance for <br /> the Project, and for Work and operations that he must perform or costs he <br /> must incur before beginning production work on the various items on the <br /> Project. Mobilization also includes, but is not limited to, posting construction <br /> identification signs, securing permits, establishing safety and security <br /> measures, preparing a traffic control plan(s), preconstruction photographs, <br /> developing a Schedule of Values for lump sum bid items, submitting the <br /> project schedule and providing product and material submittals. Also include <br /> mobilization costs for all subcontracted work along with all costs for utility <br /> coordination noted on the Plans and in the Specifications. <br /> Items not included in this item include, but are not limited to: <br /> Work covered by a specific bid item or Work that is to be included in a bid <br /> item or items. <br /> Profit, interest on borrowed money, overhead or management costs. <br /> Partial payments will be made for the lump sum contract price for I <br /> "Mobilization" as follows: <br /> When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization, or 5% of the total original contract <br /> amount, whichever is the least, will be paid. <br /> When 10% of the total original contract amount is earned from other bid <br /> items. 100% of the amount bid for mobilization, or 10% of the total contract <br /> amount, whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for <br /> mobilization in excess of 10% of the total original contract amount will be <br /> paid. <br /> Bid Item 2. Construction Surveying 1 <br /> The lump sum (LS) Contract Price for"Construction Surveying" includes, but <br /> is not limited to, all costs associated with furnishing all labor, tools, survey <br /> instruments materials, and other equipment necessary for: <br /> • setting and monitoring the location, elevation, alignment and grade of <br /> the Work as specified in the Plans I <br /> • verifying the rim and invert elevations, prior to construction, of all <br /> existing manholes and pipes where connections are to be made <br /> • verifying horizontal and vertical alignment of existing pipes <br /> • providing building layout, and <br /> Cityof Everett 01 22 20-6 January2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.