Laserfiche WebLink
1 <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> • all other survey needed or required <br /> The lump sum also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials, and other equipment <br /> necessary for obtaining the "as constructed" location and elevations of the <br /> Work, in particular, pipe invert elevations and other information necessary for <br /> ' production of the Record Drawing (As-Constructed) documents meeting the <br /> requirements defined in Section 01 78 39.13. <br /> Costs for providing a professional surveyor licensed in Washington State to <br /> ' perform the Work and stamp and sign survey documents are included in this <br /> bid item. <br /> ' Bid Item 3. Maintenance and Protection of Traffic Control <br /> This lump sum (LS) Contract Price for"Maintenance and Protection of Traffic <br /> Control" includes the maintenance and protection of traffic control materials, <br /> tools, and equipment necessary to accomplish the Work including but not <br /> limited to, signs, barricades, cones, flashers, reader boards, and temporary <br /> pavement markings. <br /> Bid Item 4. SPCC Plan <br /> The lump sum (LS) Contract Price for"SPCC Plan" includes all costs <br /> ' associated with creating and updating the accepted SPCC (Spill Prevention, <br /> Control, and Countermeasures) Plan, and all costs associated with the setup <br /> of prevention measures and for implementing the Plan as specified in <br /> WSDOT Standard Specifications Section 1-07.15(1). <br /> tBid Item 5. Construction Stormwater General Permit and SWPPP <br /> The lump sum (LS) Contract Price for"Construction Stormwater General <br /> Permit and SWPPP" includes all costs associated with securing, maintaining, <br /> and terminating coverage under the Washington State Department of <br /> Ecology (DOE) Construction Stormwater General Permit (CSGP), including <br /> developing and updating the Construction Storm Water Pollution Prevention <br /> Plan (SWPPP), per COE, County, and DOE requirements. <br /> This lump sum price also includes providing a Certified Erosion and Sediment <br /> , Control Lead (CESCL) and developing and submitting required records, <br /> reports, forms and correspondence to the Engineer and to the DOE. <br /> Bid Item 6. Type B Progress Schedule <br /> The lump sum (LS) Contract Price Bid for"Type B Progress Schedule" shall <br /> be full compensation for compliance with the requirements identified in <br /> Section 1-08.3(2)B of the WSDOT Standard Specifications. <br /> This lump sum price also includes maintaining and updating the schedule as <br /> construction dictates. All revised schedules shall be submitted to the <br /> Engineer. <br /> Bid Item 7. Trench Excavation Safety Systems <br /> The lump sum (LS) Contract Price for"Trench Excavation Safety Systems" <br /> includes the costs of all the Work, labor, tools, materials, equipment and <br /> incidentals, required to select, construct, maintain, and remove trench safety <br /> systems for any and all excavations for which a safe environment is required, <br /> ' in compliance with Washington Industrial Safety and Health ACT (RCW <br /> City of Everett 01 22 20-7 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />