My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 49.17) and safety and health standards such as Safety Standards for ' <br /> Construction Work (Chapter 296-155 WAC), General Safety and Health <br /> Standard (Chapter 296-24 WAC), General Occupational Health Standard <br /> (Chapter 296-22 WAC), and any other appropriate safety and health codes. <br /> The lump sum bid item also includes design and engineering by a licensed <br /> professional engineer, as required, for shoring other than manufactured <br /> trench boxes. <br /> Measurement for trench excavation safety systems shall be the ratio of pipe <br /> installed and backfilled to the total quantity of pipe listed on the Proposal. ' <br /> Bid Item 8. Resolution of Utility Conflicts <br /> The Force Account (FA) Contract Price for"Resolution of Utility Conflicts" <br /> shall be in accordance with Section 00 72 00 and WSDOT Specification <br /> Section 1-09.6 and has been included for specific miscellaneous work items <br /> listed below and for any additional work directed by the Engineer that is not <br /> required by the original Contract and to address any additional and <br /> unanticipated work associated with conflicts and construction circumstances <br /> determined by the Engineer not to be the responsibility or oversight of the <br /> Contractor. <br /> This bid item does not cover conflicts already identified in the Plans that the <br /> Contractor is required to locate and pothole for confirmation. No payment will <br /> be made for conflicts from utilities that the Contractor has failed to have <br /> located or that have not been located sufficiently in advance to allow for <br /> changes in pipe alignment to avoid such conflicts. <br /> The amount indicated in the proposal for this bid item is to provide a common <br /> bid amount. The actual amount paid under this item may vary from no <br /> payment to the full amount of the bid item. The Contractor will be required to <br /> 111 <br /> initiate discussion for any work they believe is additional work due to <br /> unanticipated conflicts and may be required to provide a cost estimate for the <br /> Engineer's review and approval prior to the work being performed. Approved <br /> additional work performed under this bid item will be performed only after a <br /> work directive is issued by the City/Engineer. Any additional work performed <br /> prior to the work directive issued by the City/Engineer will not be <br /> compensated under this bid item. <br /> Bid Item 9. Demolition <br /> The lump sum (LS) Contract Price for"Demolition" shall be full compensation 1 <br /> for costs of all Work, labor, tools, materials, equipment, and incidentals <br /> necessary to remove the items or materials identified on the Plans and as <br /> necessary for construction. I <br /> Payment for furnishing, placing, and compacting the imported gravel borrow <br /> material in the vacant trenches left after the removal of the 36-inch RCP <br /> overflow and drain pipe and leak detection pipe under the new electrical <br /> building will be made under the bid item "Gravel Borrow." <br /> Bid Item 10. Removal of Unsuitable Material ' <br /> Measurement will only be made for materials removed at a depth of 6 inches <br /> or greater below the invert elevation of a pipe or bottom of required pipe ' <br /> City of Everett 01 22 20-8 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 I <br />