Laserfiche WebLink
I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> bedding (whichever is deeper), or 6 inches below the compacted aggregate <br /> base for structures indicated on the drawings. The quantities of authorized <br /> unsuitable material excavation paid for by the City shall be computed from in- <br /> place, field measurements and estimates made by the Engineer. <br /> ' The unit Contract Price per cubic yard (CY)for"Removal of Unsuitable <br /> Material" shall constitute full compensation for all costs of the Work, labor, <br /> materials, tools, equipment, and incidentals necessary to remove unsuitable <br /> foundation material within excavations for new storm or water utilities and <br /> ' structures. The unit contract price includes excavating, loading, hauling, <br /> temporary stockpiling, and properly disposing off site of unsuitable material <br /> from the trench bottom. For the purpose of establishing a common basis for <br /> ' evaluating bids, an arbitrary quantity has been shown on the bid form and <br /> does not necessarily represent the quantity, if any, of"Removal of Unsuitable <br /> Material" that may be necessary for project work. Actual quantities will be <br /> determined in the field as work progresses. Removal of unsuitable material <br /> work will only be conducted with approval from the Engineer. <br /> Furnishing imported replacement backfill material, Foundation Material Class <br /> A or B, from a Contractor-supplied source will be paid for under the <br /> associated aggregate bid item in the Proposal/Construction Contract. <br /> Bid Item 11. Site Grading <br /> Measurement shall be computed from field measurements. <br /> The unit Contract Price per square yard (SY) for"Site Grading" shall <br /> constitute full compensation for all costs of the Work, labor, materials, tools, <br /> equipment, and incidentals necessary to grade the site as shown on the <br /> Plans or as necessary for the Work. The unit contract price includes <br /> excavating, loading, hauling, and properly disposing off site of unsuitable <br /> material, temporary stockpiling and properly covering topsoil and other <br /> suitable materials for grading from excavated areas. <br /> Bid Item 12. Controlled Density Fill (CDF) <br /> Measurement of Controlled Density Fill shall be based on cubic yard of <br /> material used to backfill dimensions as approved by the Inspector. <br /> The unit Contract Price per cubic yard (CY)for"Controlled Density Fill (CDF)" <br /> shall constitute full compensation for all Work labor, materials, tools and <br /> equipment necessary to furnish, deliver, and place the CDF in accordance <br /> with the Specifications, COE Standard Drawings and the Plans. <br /> 1 Bid Item 13. Crushed Surfacing Top and Base Course <br /> Measurement for crushed surfacing top and base course will be by the ton as <br /> ' recorded on certified weight tickets and limited to dimensions defined in the <br /> Work, descriptions for other bid items, shown on the Plans, details or COE <br /> Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> ' Surfacing Top and Base Course material placed exceeding "neatline" <br /> quantities without advance authorization by the Inspector will not be paid for. <br /> The unit Contract Price per ton (TN) for"Crushed Surfacing Top and Base <br /> Course" shall be full compensation for all Work, labor, material, tools, and <br /> equipment necessary to furnish, haul, stockpile, place, grade, and compact <br /> City of Everett 01 22 20-9 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />